ITAC Assessment: WI0040
ITAC logo
ITAC Assessment: WI0040
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product MILK, ICE CREAM, CHEESE
NAICS
n/a
SIC 2026: Fluid Milk
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 5,500
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $472,194 6,735,932
kWh
Natural Gas $97,219 29,664
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $38,247 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,956

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4312: Improve lubrication practices $5,607 - $5,607
80,012
kWh
- -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,804 - $2,804
39,859
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $687 $417 $687
9,672
kWh
- -
04 2.3132: Recharge batteries on during off-peak demand periods $894 $500 $894
-
kWh
- -
05 2.7226: Use computer programs to optimize hvac performance $7,516 $8,000 $7,516
107,268
kWh
- -
06 2.2511: Insulate bare equipment $608 $360 $608
8,792
kWh
- -
07 2.4221: Install compressor air intakes in coolest locations $1,534 $1,000 $1,534
21,981
kWh
- -
08 2.2621: Modify refrigeration system to operate at a lower pressure $14,600 - $14,600
208,382
kWh
- -
09 2.7447: Install vinyl strip / high speed / air curtain doors $2,248 $700 - $2,248
-
MMBtu
-
10 2.1233: Analyze flue gas for proper air/fuel ratio $1,749 $250 - $1,849
-
MMBtu
$(-100.0)
TOTAL RECOMMENDED $38,247 $11,227 $34,250
475,966
kWh
$4,097
-
MMBtu
$(-100.0)
TOTAL IMPLEMENTED $21,956 $250 $20,207
288,394
kWh
$1,849
-
MMBtu
$(-100.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs