Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product NAILS
NAICS
n/a
SIC 3315: Steel Wiredrawing and Steel Nails and Spikes
Sales Range $10
M
to 50
M
# of Employees 25
Plant Area
n/a
Annual Production 6,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $51,446 480,950
kWh
Natural Gas $9,096 1,899
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,688 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,102

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4312: Improve lubrication practices $3,768 - $3,768
35,170
kWh
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,879 - $1,879
17,585
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,792 $285 $1,792
16,706
kWh
-
04 2.4221: Install compressor air intakes in coolest locations $2,818 $950 $2,818
26,377
kWh
-
06 2.7447: Install vinyl strip / high speed / air curtain doors $431 $700 - $431
-
MMBtu
TOTAL RECOMMENDED $10,688 $1,935 $10,257
95,838
kWh
$431
-
MMBtu
TOTAL IMPLEMENTED $4,102 $985 $3,671
34,291
kWh
$431
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs