Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product STITCH. MACHINES & PARTS
NAICS
n/a
SIC 3559: Special Industry Machinery, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 5,880
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $43,606 568,875
kWh
Natural Gas $18,355 3,620
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,871 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,932

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4312: Improve lubrication practices $2,645 - $2,645
34,584
kWh
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,286 - $1,286
16,413
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,383 $573 $2,383
31,067
kWh
-
04 2.4221: Install compressor air intakes in coolest locations $263 $398 $263
3,517
kWh
-
05 2.3191: Use demand controller or load shedder $724 $2,000 $724
-
kWh
-
06 2.7447: Install vinyl strip / high speed / air curtain doors $570 $1,600 - $570
-
MMBtu
TOTAL RECOMMENDED $7,871 $4,571 $7,301
85,581
kWh
$570
-
MMBtu
TOTAL IMPLEMENTED $3,932 $971 $3,932
50,997
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs