| Assessment Year | 1987 |
|---|---|
| Principal Product | PACKAGING MACHINERY |
| NAICS |
n/a
|
| SIC | 3556: Food Products Machinery |
| Sales Range | $5 M to 10M |
| # of Employees | 40 |
| Plant Area |
n/a
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 2,405
hrs
|
| Location (State) | Wisconsin |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $15,455 | 204,865 |
kWh
|
$0.075 |
| Natural Gas | $6,723 | 1,126 |
MMBtu
|
$5.97 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $4,211 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $3,385 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4312: Improve lubrication practices | $1,304 | - |
$1,304
17,292
kWh
|
- | |
| 02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $332 | - |
$332
4,396
kWh
|
- | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,150 | $216 |
$1,150
15,240
kWh
|
- | |
| 04 | 2.4221: Install compressor air intakes in coolest locations | $265 | $148 |
$265
3,517
kWh
|
- | |
| 05 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $342 | $350 |
$509
6,741
kWh
|
$(-167.0)
-
MMBtu
|
|
| 06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $334 | $400 | - |
$334
-
MMBtu
|
|
| 07 | 2.7447: Install vinyl strip / high speed / air curtain doors | $484 | $800 | - |
$484
-
MMBtu
|
|
| TOTAL RECOMMENDED | $4,211 | $1,914 |
$3,560
47,186
kWh
|
$651
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $3,385 | $764 |
$3,051
40,445
kWh
|
$334
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs