ITAC Assessment: UW0053
ITAC logo
ITAC Assessment: UW0053
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Newsprint
NAICS 323111: Commercial Printing (except Screen and Books)
SIC 2741: Miscellaneous Publishing
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 60,000
ft2
Annual Production 500,000
pieces
Production Hrs. Annual 2,210
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $146,234 1,124,800
kWh
Electricity Demand $13,562 4,513
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $62,695 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $54,271

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $29,663 $160,551 $27,308
210,065
kWh
$2,355
-
kW-mo/yr
02 2.4226: Use / purchase optimum sized compressor $13,673 $11,000 $12,708
97,756
kWh
$965
-
kW-mo/yr
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $10,936 $1,900 $10,592
81,509
kWh
$344
-
kW-mo/yr
04 2.4133: Use most efficient type of electric motors $4,830 $21,939 $4,038
31,059
kWh
$792
-
kW-mo/yr
05 2.7446: Utilize sensors controlling roof and wall openings $3,594 $3,150 $3,594
27,648
kWh
-
TOTAL RECOMMENDED $62,695 $198,540 $58,240
448,037
kWh
$4,455
-
kW-mo/yr
TOTAL IMPLEMENTED $54,271 $173,451 $50,608
389,330
kWh
$3,663
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs