ITAC Assessment: UW0009
ITAC logo
ITAC Assessment: UW0009
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Aluminum cans
NAICS 332431: Metal Can Manufacturing
SIC 3411: Metal Cans
Sales Range $50
M
to 100
M
# of Employees 109
Plant Area 180,000
ft2
Annual Production 1,800,000,000
pieces
Production Hrs. Annual 8,640
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,127,837 21,663,600
kWh
Electricity Demand $211,746 36,048
kW-mo/yr
Electricity Fees $11,416 -
Natural Gas $866,333 78,076
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $176,769 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,402

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Water Consumption Savings
01 2.4226: Use / purchase optimum sized compressor $93,799 $136,650 $81,034
1,460,071
kWh
$12,765
-
kW-mo/yr
- - - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $27,889 $1,720 $28,640
516,031
kWh
$4,449
-
kW-mo/yr
- - $(-5,200.0) -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $28,369 $138,420 $24,556
442,443
kWh
$3,813
-
kW-mo/yr
- - - -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $8,031 $7,140 $3,689
66,469
kWh
$557
-
kW-mo/yr
- $1,501
-
Tgal
- $2,284
-
Tgal
05 2.1117: Relocate oven / furnace to more efficient location $11,196 $2,080 $9,672
174,266
kWh
$1,524
-
kW-mo/yr
- - - -
06 2.1116: Improve combustion control capability $4,114 $3,000 - - $5,314
-
MMBtu
- $(-1,200.0) -
07 2.4151: Develop a repair/replace policy $3,371 $1,984 $2,960
53,327
kWh
$411
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $176,769 $290,994 $150,551
2,712,607
kWh
$23,519
-
kW-mo/yr
$5,314
-
MMBtu
$1,501
-
Tgal
$(-6,400.0) $2,284
-
Tgal
TOTAL IMPLEMENTED $11,402 $9,124 $6,649
119,796
kWh
$968
-
kW-mo/yr
- $1,501
-
Tgal
- $2,284
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs