ITAC Assessment: UU0299
ITAC logo
ITAC Assessment: UU0299
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Composite Aircraft Components
NAICS 336411: Aircraft Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 53
Plant Area 13,114
ft2
Annual Production 75
units
Production Hrs. Annual 8,400
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $116,456 3,175,680
kWh
Electricity Demand $115,773 6,906
kW-mo/yr
Electricity Fees $88,516 -
Natural Gas $128,180 15,820
MMBtu
Waste Disposal Costs
Water Usage $8,498 19
Tgal
TOTAL YEARLY COSTS $457,423
RECOMMENDED SAVINGS* $70,928 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.3141: Use battery storage for demand control $36,773 $132,000 - $17,363
-
kW-mo/yr
- $19,410
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,120 $2,840 $3,707
101,000
kWh
$2,413
-
kW-mo/yr
- -
03 2.7447: Install vinyl strip / high speed / air curtain doors $6,775 $20,100 $(-2,134.9)
(-57,700)
kWh
- $8,910
-
MMBtu
-
04 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle $761 $220 $24
660
kWh
- $737
-
MMBtu
-
05 2.4239: Eliminate or reduce compressed air usage $2,526 $21,800 $1,681
45,800
kWh
$845
-
kW-mo/yr
- -
06 2.7135: Install occupancy sensors $15,973 $56,500 $6,808
184,000
kWh
$9,165
-
kW-mo/yr
- -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,000 $15,100 $2,000
52,500
kWh
- - -
TOTAL RECOMMENDED $70,928 $248,560 $12,085
326,260
kWh
$29,787
-
kW-mo/yr
$9,647
-
MMBtu
$19,410
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs