| Assessment Year | 2026 |
|---|---|
| Principal Product | Composite Aircraft Components |
| NAICS | 336411: Aircraft Manufacturing |
| SIC | 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 53 |
| Plant Area |
13,114
ft2
|
| Annual Production | 75
units
|
| Production Hrs. Annual | 8,400
hrs
|
| Location (State) | Utah |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $116,456 | 3,175,680 |
kWh
|
$0.037 | |
| Electricity Demand | $115,773 | 6,906 |
kW-mo/yr
|
$16.76 | |
| Electricity Fees | $88,516 | - |
|
- | |
| Natural Gas | $128,180 | 15,820 |
MMBtu
|
$8.10 | |
| Waste Disposal Costs | |||||
| Water Usage | $8,498 | 19 |
Tgal
|
$447.26 | |
| TOTAL YEARLY COSTS | $457,423 | ||||
| RECOMMENDED SAVINGS* | $70,928 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.3141: Use battery storage for demand control | $36,773 | $132,000 | - |
$17,363
-
kW-mo/yr
|
- | $19,410 | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,120 | $2,840 |
$3,707
101,000
kWh
|
$2,413
-
kW-mo/yr
|
- | - | |
| 03 | 2.7447: Install vinyl strip / high speed / air curtain doors | $6,775 | $20,100 |
$(-2,134.9)
(-57,700)
kWh
|
- |
$8,910
-
MMBtu
|
- | |
| 04 | 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle | $761 | $220 |
$24
660
kWh
|
- |
$737
-
MMBtu
|
- | |
| 05 | 2.4239: Eliminate or reduce compressed air usage | $2,526 | $21,800 |
$1,681
45,800
kWh
|
$845
-
kW-mo/yr
|
- | - | |
| 06 | 2.7135: Install occupancy sensors | $15,973 | $56,500 |
$6,808
184,000
kWh
|
$9,165
-
kW-mo/yr
|
- | - | |
| 07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,000 | $15,100 |
$2,000
52,500
kWh
|
- | - | - | |
| TOTAL RECOMMENDED | $70,928 | $248,560 |
$12,085
326,260
kWh
|
$29,787
-
kW-mo/yr
|
$9,647
-
MMBtu
|
$19,410 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs