ITAC Assessment: UU0205
ITAC logo
ITAC Assessment: UU0205
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Sporting Goods
NAICS 339920: Sporting and Athletic Goods Manufacturing
SIC 3949: Sporting and Athletic Goods, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 350
Plant Area 660,000
ft2
Annual Production 660,000
thousand feet
Production Hrs. Annual 8,112
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $206,375 5,349,600
kWh
Electricity Demand $161,273 9,874
kW-mo/yr
Electricity Fees $47,441 -
Natural Gas $38,797 5,014
MMBtu
Waste Disposal Costs
Water Usage $4,431 2,401
Tgal
TOTAL YEARLY COSTS $458,317
RECOMMENDED SAVINGS* $35,636 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,293

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.4133: Use most efficient type of electric motors $10,629 $10,629 $8,366
216,839
kWh
$2,263
-
kW-mo/yr
- -
02 2.3137: Use power during off-peak periods $10,548 $18,900 - $10,548
-
kW-mo/yr
- -
03 2.7221: Lower temperature during the winter season and vice-versa $8,310 $28,263 $(-2,226.0)
(-57,712)
kWh
$(-1,461.3)
-
kW-mo/yr
$11,997
-
MMBtu
-
04 2.8113: Purchase gas directly from a contract gas supplier $3,404 $9,200 - - - $3,404
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,293 $198 $615
15,940
kWh
$678
-
kW-mo/yr
- -
06 2.6231: Utilize controls to operate equipment only when needed $1,070 $150 $1,070
27,811
kWh
- - -
07 2.4221: Install compressor air intakes in coolest locations $382 $720 $100
2,590
kWh
$282
-
kW-mo/yr
- -
TOTAL RECOMMENDED $35,636 $68,060 $7,925
205,468
kWh
$12,310
-
kW-mo/yr
$11,997
-
MMBtu
$3,404
TOTAL IMPLEMENTED $1,293 $198 $615
15,940
kWh
$678
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs