ITAC Assessment: CL2004
ITAC logo
ITAC Assessment: CL2004
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Treated Wastewater
NAICS 562219: Other Nonhazardous Waste Treatment and Disposal
SIC 4952: Sewerage Systems
Sales Range $10
M
to 50
M
# of Employees 15
Plant Area 250,000
ft2
Annual Production 4,745,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) South Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $842,827 19,422,000
kWh
Electricity Demand $455,194 40,788
kW-mo/yr
Electricity Fees $1,016 -
Natural Gas $8,021 988
MMBtu
Waste Disposal Costs
Water Usage $16,054 5,402
Tgal
Water Disposal $1 5
Tgal
TOTAL YEARLY COSTS $1,323,113
RECOMMENDED SAVINGS* $131,916 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $131,916

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $12,961 $27,670 $5,328
123,912
kWh
$7,633
-
kW-mo/yr
02 2.3417: Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat $79,699 $350,000 $58,796
1,367,339
kWh
$20,903
-
kW-mo/yr
03 2.4322: Use or replace with energy efficient substitutes $39,256 $196,000 $28,960
673,493
kWh
$10,296
-
kW-mo/yr
TOTAL RECOMMENDED $131,916 $573,670 $93,084
2,164,744
kWh
$38,832
-
kW-mo/yr
TOTAL IMPLEMENTED $131,916 $573,670 $93,084
2,164,744
kWh
$38,832
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs