| Assessment Year | 2020 |
|---|---|
| Principal Product | Treated Wastewater |
| NAICS | 562219: Other Nonhazardous Waste Treatment and Disposal |
| SIC | 4952: Sewerage Systems |
| Sales Range | $10 M to 50M |
| # of Employees | 15 |
| Plant Area |
250,000
ft2
|
| Annual Production | 4,745,000
Tgal
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | South Carolina |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $842,827 | 19,422,000 |
kWh
|
$0.043 | |
| Electricity Demand | $455,194 | 40,788 |
kW-mo/yr
|
$11.16 | |
| Electricity Fees | $1,016 | - |
|
- | |
| Natural Gas | $8,021 | 988 |
MMBtu
|
$8.12 | |
| Waste Disposal Costs | |||||
| Water Usage | $16,054 | 5,402 |
Tgal
|
$2.97 | |
| Water Disposal | $1 | 5 |
Tgal
|
$0.19 | |
| TOTAL YEARLY COSTS | $1,323,113 | ||||
| RECOMMENDED SAVINGS* | $131,916 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $131,916 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $12,961 | $27,670 |
$5,328
123,912
kWh
|
$7,633
-
kW-mo/yr
|
|
| 02 | 2.3417: Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat | $79,699 | $350,000 |
$58,796
1,367,339
kWh
|
$20,903
-
kW-mo/yr
|
|
| 03 | 2.4322: Use or replace with energy efficient substitutes | $39,256 | $196,000 |
$28,960
673,493
kWh
|
$10,296
-
kW-mo/yr
|
|
| TOTAL RECOMMENDED | $131,916 | $573,670 |
$93,084
2,164,744
kWh
|
$38,832
-
kW-mo/yr
|
||
| TOTAL IMPLEMENTED | $131,916 | $573,670 |
$93,084
2,164,744
kWh
|
$38,832
-
kW-mo/yr
|
||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs