ITAC Assessment: UU0139
ITAC logo
ITAC Assessment: UU0139
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Dairy Products
NAICS 311512: Creamery Butter Manufacturing
SIC 2021: Creamery Butter
Sales Range $5
M
to 10
M
# of Employees 200
Plant Area 60,000
ft2
Annual Production 150,000,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,010,109 15,155,240
kWh
Natural Gas $426,036 207,667
MMBtu
Waste Disposal Costs
Water Usage $55,665 60
Tgal
TOTAL YEARLY COSTS $1,491,810
RECOMMENDED SAVINGS* $70,648 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $70,648

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Ancillary Material Cost Savings
01 2.4226: Use / purchase optimum sized compressor $51,858 $44,642 $51,858
778,650
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $14,262 $20,223 $16,472
245,854
kWh
$(-2,210.0)
03 2.7134: Use photocell controls $4,082 $2,275 $4,082
60,932
kWh
-
04 2.7261: Install timers and/or thermostats $446 $100 $446
6,693
kWh
-
TOTAL RECOMMENDED $70,648 $67,240 $72,858
1,092,129
kWh
$(-2,210.0)
TOTAL IMPLEMENTED $70,648 $67,240 $72,858
1,092,129
kWh
$(-2,210.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs