ITAC Assessment: IP0114
ITAC logo
ITAC Assessment: IP0114
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Lawn spreader
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 85
Plant Area 188,200
ft2
Annual Production 200,000
units
Production Hrs. Annual 2,289
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $162,256 1,727,424
kWh
Electricity Demand $58,903 5,256
kW-mo/yr
Electricity Fees $1,055 -
Natural Gas $87,317 10,679
MMBtu
TOTAL YEARLY COSTS $309,531
RECOMMENDED SAVINGS* $22,207 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,490

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.7221: Lower temperature during the winter season and vice-versa $1,085 - $897
9,547
kWh
- - $188
-
MMBtu
02 2.8121: Apply for tax-free status for energy purchases $591 - - - $591 -
03 2.4231: Reduce the pressure of compressed air to the minimum required $245 $10 $151
1,611
kWh
$94
-
kW-mo/yr
- -
04 2.6242: Minimize operation of equipment maintained in standby condition $3,320 $480 $3,320
35,342
kWh
- - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,093 $150 $1,093
11,640
kWh
- - -
06 2.6218: Turn off equipment when not in use $681 $680 $681
7,251
kWh
- - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $13,152 $20,160 $9,049
96,340
kWh
$4,103
-
kW-mo/yr
- -
08 2.2614: Use cooling tower or economizer to replace chiller cooling $2,040 $4,200 $2,040
21,719
kWh
- - -
TOTAL RECOMMENDED $22,207 $25,680 $17,231
183,450
kWh
$4,197
-
kW-mo/yr
$591 $188
-
MMBtu
TOTAL IMPLEMENTED $14,490 $20,320 $10,293
109,591
kWh
$4,197
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs