Assessment Year | 2019 |
---|---|
Principal Product | Lawn spreader |
NAICS | 326199: All Other Plastics Product Manufacturing |
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 85 |
Plant Area |
188,200
ft2
|
Annual Production | 200,000
units
|
Production Hrs. Annual | 2,289
hrs
|
Location (State) | Indiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $162,256 | 1,727,424 |
kWh
|
$0.094 |
Electricity Demand | $58,903 | 5,256 |
kW-mo/yr
|
$11.21 |
Electricity Fees | $1,055 | - |
|
- |
Natural Gas | $87,317 | 10,679 |
MMBtu
|
$8.18 |
TOTAL YEARLY COSTS | $309,531 | |||
RECOMMENDED SAVINGS* | $22,207 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $14,490 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7221: Lower temperature during the winter season and vice-versa | $1,085 | - |
$897
9,547
kWh
|
- | - |
$188
-
MMBtu
|
|
02 | 2.8121: Apply for tax-free status for energy purchases | $591 | - | - | - | $591 | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $245 | $10 |
$151
1,611
kWh
|
$94
-
kW-mo/yr
|
- | - | |
04 | 2.6242: Minimize operation of equipment maintained in standby condition | $3,320 | $480 |
$3,320
35,342
kWh
|
- | - | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,093 | $150 |
$1,093
11,640
kWh
|
- | - | - | |
06 | 2.6218: Turn off equipment when not in use | $681 | $680 |
$681
7,251
kWh
|
- | - | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $13,152 | $20,160 |
$9,049
96,340
kWh
|
$4,103
-
kW-mo/yr
|
- | - | |
08 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $2,040 | $4,200 |
$2,040
21,719
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $22,207 | $25,680 |
$17,231
183,450
kWh
|
$4,197
-
kW-mo/yr
|
$591 |
$188
-
MMBtu
|
||
TOTAL IMPLEMENTED | $14,490 | $20,320 |
$10,293
109,591
kWh
|
$4,197
-
kW-mo/yr
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs