| Assessment Year | 2001 |
|---|---|
| Principal Product | Screen printing and embroidery |
| NAICS |
n/a
|
| SIC | 2396: Automotive Trimmings, Apparel Findings, and Related Products |
| Sales Range | $10 M to 50M |
| # of Employees | 203 |
| Plant Area |
70,000
ft2
|
| Annual Production | 5,709,000
pieces
|
| Production Hrs. Annual | 2,210
hrs
|
| Location (State) | Florida |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $86,437 | 1,627,765 |
kWh
|
$0.053 |
| Electricity Demand | $42,565 | 4,846 |
kW-mo/yr
|
$8.78 |
| Natural Gas | $20,398 | 2,384 |
MMBtu
|
$8.56 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $177,285 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Administrative Changes Savings | Primary Product Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7221: Lower temperature during the winter season and vice-versa | $5,105 | $2,513 |
$5,105
63,812
kWh
|
- | - | |
| 02 | 2.7111: Reduce illumination to minimum necessary levels | $2,467 | $333 |
$2,467
30,832
kWh
|
- | - | |
| 03 | 2.1321: Replace fossil fuel equipment with electrical equipment | $16,244 | $2,084 |
$16,244
203,050
kWh
|
- | - | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,608 | $312 |
$4,608
57,600
kWh
|
- | - | |
| 05 | 2.7243: Improve air circulation with destratification fans / other methods | $22,646 | $7,000 | - | - | $22,646 | |
| 06 | 2.6212: Turn off equipment during breaks, reduce operating time | $6,215 | $1,126 | - | $6,215 | - | |
| 07 | 4.122: Develop standard procedures to improve internal yields | $120,000 | $44,200 | - | - | $120,000 | |
| TOTAL RECOMMENDED | $177,285 | $57,568 |
$28,424
355,294
kWh
|
$6,215 | $142,646 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Administrative Changes Savings | Primary Product Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs