ITAC Assessment: UU0111
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product paper products
NAICS 322230: Stationery Product Manufacturing
SIC 2675: Die-Cut Paper and Paperboard and Cardboard
Sales Range $100
M
to 500
M
# of Employees 265
Plant Area 312,400
ft2
Annual Production 102,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $103,883 4,035,840
kWh
Electricity Demand $105,614 13,774
kW-mo/yr
Natural Gas $24,990 2,709
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $56,880 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.3191: Use demand controller or load shedder $22,930 $20,000 - $22,930
-
kW-mo/yr
-
02 2.4225: Install common header on compressors $1,760 $8,000 $1,760
62,740
kWh
- -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $17,680 $1,560 $5,690
202,390
kWh
$11,990
-
kW-mo/yr
-
04 2.4222: Install adequate dryers on air lines to eliminate blowdown $1,320 $605 $1,230
43,640
kWh
$90
-
kW-mo/yr
-
05 2.7447: Install vinyl strip / high speed / air curtain doors $9,860 $33,500 $1,300
46,245
kWh
$850
-
kW-mo/yr
$7,710
-
MMBtu
06 2.7231: Use radiant heater for spot heating $3,330 $17,000 - - $3,330
-
MMBtu
TOTAL RECOMMENDED $56,880 $80,665 $9,980
355,015
kWh
$35,860
-
kW-mo/yr
$11,040
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs