ITAC Assessment: UU0079
ITAC logo
ITAC Assessment: UU0079
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product cheese
NAICS 311513: Cheese Manufacturing
SIC 2022: Natural, Processed, and Imitation Cheese
Sales Range $10
M
to 50
M
# of Employees 83
Plant Area 32,300
ft2
Annual Production 94,000,000
lb
Production Hrs. Annual 3,120
hrs
Location (State) Idaho

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $338,156 12,284,555
kWh
Electricity Demand $58,652 21,107
kW-mo/yr
Natural Gas $58,864 98,218
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $293,110 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $6,140 $18,959 $4,110
149,200
kWh
$2,030
-
kW-mo/yr
-
02 2.4221: Install compressor air intakes in coolest locations $840 $360 $560
20,360
kWh
$280
-
kW-mo/yr
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,120 $710 $750
27,230
kWh
$370
-
kW-mo/yr
-
04 2.1213: Direct warmest air to combustion intake $130 - - - $130
-
MMBtu
05 2.7135: Install occupancy sensors $340 $1,380 $340
12,480
kWh
- -
06 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $284,540 $3,000,000 $289,520
10,500,000
kWh
$63,810
-
kW-mo/yr
$(-68,790.0)
-
MMBtu
TOTAL RECOMMENDED $293,110 $3,021,409 $295,280
10,709,270
kWh
$66,490
-
kW-mo/yr
$(-68,660.0)
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs