| Assessment Year | 2005 |
|---|---|
| Principal Product | cheese |
| NAICS | 311513: Cheese Manufacturing |
| SIC | 2022: Natural, Processed, and Imitation Cheese |
| Sales Range | $10 M to 50M |
| # of Employees | 83 |
| Plant Area |
32,300
ft2
|
| Annual Production | 94,000,000
lb
|
| Production Hrs. Annual | 3,120
hrs
|
| Location (State) | Idaho |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $338,156 | 12,284,555 |
kWh
|
$0.028 |
| Electricity Demand | $58,652 | 21,107 |
kW-mo/yr
|
$2.78 |
| Natural Gas | $58,864 | 98,218 |
MMBtu
|
$0.60 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $293,110 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4133: Use most efficient type of electric motors | $6,140 | $18,959 |
$4,110
149,200
kWh
|
$2,030
-
kW-mo/yr
|
- | |
| 02 | 2.4221: Install compressor air intakes in coolest locations | $840 | $360 |
$560
20,360
kWh
|
$280
-
kW-mo/yr
|
- | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,120 | $710 |
$750
27,230
kWh
|
$370
-
kW-mo/yr
|
- | |
| 04 | 2.1213: Direct warmest air to combustion intake | $130 | - | - | - |
$130
-
MMBtu
|
|
| 05 | 2.7135: Install occupancy sensors | $340 | $1,380 |
$340
12,480
kWh
|
- | - | |
| 06 | 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $284,540 | $3,000,000 |
$289,520
10,500,000
kWh
|
$63,810
-
kW-mo/yr
|
$(-68,790.0)
-
MMBtu
|
|
| TOTAL RECOMMENDED | $293,110 | $3,021,409 |
$295,280
10,709,270
kWh
|
$66,490
-
kW-mo/yr
|
$(-68,660.0)
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs