Assessment Year | 2004 |
---|---|
Principal Product | concrete precast |
NAICS | 327390: Other Concrete Product Manufacturing |
SIC | 3272: Concrete Products, Except Block and Brick |
Sales Range | $10 M to 50M |
# of Employees | 146 |
Plant Area |
4,800
ft2
|
Annual Production | 90,000
ton
|
Production Hrs. Annual | 3,500
hrs
|
Location (State) | Utah |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $33,079 | 1,140,080 |
kWh
|
$0.029 |
Electricity Demand | $53,001 | 3,254 |
kW-mo/yr
|
$16.29 |
Natural Gas | $88,577 | 16,052 |
MMBtu
|
$5.52 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $38,725 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $10,135 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.3191: Use demand controller or load shedder | $6,850 | $10,000 | - |
$6,850
-
kW-mo/yr
|
- | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,465 | $405 |
$1,138
35,249
kWh
|
$1,327
-
kW-mo/yr
|
- | - | |
03 | 2.2437: Recover waste heat from equipment | $4,890 | $4,820 | - | - |
$4,890
-
MMBtu
|
- | |
04 | 2.4221: Install compressor air intakes in coolest locations | $1,970 | $400 |
$890
27,600
kWh
|
$1,080
-
kW-mo/yr
|
- | - | |
05 | 2.7243: Improve air circulation with destratification fans / other methods | $5,620 | $12,000 |
$(-260.0)
(-8,000)
kWh
|
$(-130.0)
-
kW-mo/yr
|
$6,010
-
MMBtu
|
- | |
06 | 3.5316: Contract a wood pallet recycling company | $5,720 | $1,120 | - | - | - | $5,720 | |
07 | 2.3212: Optimize plant power factor | $10,400 | $11,590 | - |
$10,400
-
kW-mo/yr
|
- | - | |
08 | 2.8114: Change rate schedules or other changes in utility service | $810 | $450 | - | - | - | $810 | |
TOTAL RECOMMENDED | $38,725 | $40,785 |
$1,768
54,849
kWh
|
$19,527
-
kW-mo/yr
|
$10,900
-
MMBtu
|
$6,530 | ||
TOTAL IMPLEMENTED | $10,135 | $6,075 |
$2,028
62,849
kWh
|
$2,407
-
kW-mo/yr
|
$4,890
-
MMBtu
|
$810 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs