ITAC Assessment: UU0078
ITAC logo
ITAC Assessment: UU0078
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product concrete precast
NAICS 327390: Other Concrete Product Manufacturing
SIC 3272: Concrete Products, Except Block and Brick
Sales Range $10
M
to 50
M
# of Employees 146
Plant Area 4,800
ft2
Annual Production 90,000
ton
Production Hrs. Annual 3,500
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $33,079 1,140,080
kWh
Electricity Demand $53,001 3,254
kW-mo/yr
Natural Gas $88,577 16,052
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $38,725 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,135

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.3191: Use demand controller or load shedder $6,850 $10,000 - $6,850
-
kW-mo/yr
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,465 $405 $1,138
35,249
kWh
$1,327
-
kW-mo/yr
- -
03 2.2437: Recover waste heat from equipment $4,890 $4,820 - - $4,890
-
MMBtu
-
04 2.4221: Install compressor air intakes in coolest locations $1,970 $400 $890
27,600
kWh
$1,080
-
kW-mo/yr
- -
05 2.7243: Improve air circulation with destratification fans / other methods $5,620 $12,000 $(-260.0)
(-8,000)
kWh
$(-130.0)
-
kW-mo/yr
$6,010
-
MMBtu
-
06 3.5316: Contract a wood pallet recycling company $5,720 $1,120 - - - $5,720
07 2.3212: Optimize plant power factor $10,400 $11,590 - $10,400
-
kW-mo/yr
- -
08 2.8114: Change rate schedules or other changes in utility service $810 $450 - - - $810
TOTAL RECOMMENDED $38,725 $40,785 $1,768
54,849
kWh
$19,527
-
kW-mo/yr
$10,900
-
MMBtu
$6,530
TOTAL IMPLEMENTED $10,135 $6,075 $2,028
62,849
kWh
$2,407
-
kW-mo/yr
$4,890
-
MMBtu
$810
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs