Assessment Year | 2020 |
---|---|
Principal Product | Backup Alarms |
NAICS | 336390: Other Motor Vehicle Parts Manufacturing |
SIC | 3647: Vehicular Lighting Equipment |
Sales Range | $50 M to 100M |
# of Employees | 150 |
Plant Area |
80,000
ft2
|
Annual Production | 500,000
units
|
Production Hrs. Annual | 2,040
hrs
|
Location (State) | Idaho |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $62,155 | 1,199,792 |
kWh
|
$0.052 |
Electricity Demand | $19,547 | 2,975 |
kW-mo/yr
|
$6.57 |
Electricity Fees | $265 | - |
|
- |
Natural Gas | $7,419 | 1,476 |
MMBtu
|
$5.03 |
TOTAL YEARLY COSTS | $89,386 | |||
RECOMMENDED SAVINGS* | $12,231 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,955 | $12,790 |
$2,498
48,233
kWh
|
$1,457
-
kW-mo/yr
|
- | |
02 | 2.7251: Reduce air conditioning load by evaporating water from roof | $2,687 | $7,120 |
$2,687
52,287
kWh
|
- | - | |
03 | 2.7224: Reduce space conditioning during non-working hours | $2,704 | $1,017 |
$1,009
19,471
kWh
|
- |
$1,696
-
MMBtu
|
|
04 | 2.4224: Upgrade controls on compressors | $1,507 | $3,280 |
$1,507
29,093
kWh
|
- | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $618 | $405 |
$381
7,358
kWh
|
$237
-
kW-mo/yr
|
- | |
06 | 2.7135: Install occupancy sensors | $760 | $1,471 |
$760
14,666
kWh
|
- | - | |
TOTAL RECOMMENDED | $12,231 | $26,083 |
$8,842
171,108
kWh
|
$1,694
-
kW-mo/yr
|
$1,696
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs