ITAC Assessment: BS0134
ITAC logo
ITAC Assessment: BS0134
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Backup Alarms
NAICS 336390: Other Motor Vehicle Parts Manufacturing
SIC 3647: Vehicular Lighting Equipment
Sales Range $50
M
to 100
M
# of Employees 150
Plant Area 80,000
ft2
Annual Production 500,000
units
Production Hrs. Annual 2,040
hrs
Location (State) Idaho

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $62,155 1,199,792
kWh
Electricity Demand $19,547 2,975
kW-mo/yr
Electricity Fees $265 -
Natural Gas $7,419 1,476
MMBtu
TOTAL YEARLY COSTS $89,386
RECOMMENDED SAVINGS* $12,231 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,955 $12,790 $2,498
48,233
kWh
$1,457
-
kW-mo/yr
-
02 2.7251: Reduce air conditioning load by evaporating water from roof $2,687 $7,120 $2,687
52,287
kWh
- -
03 2.7224: Reduce space conditioning during non-working hours $2,704 $1,017 $1,009
19,471
kWh
- $1,696
-
MMBtu
04 2.4224: Upgrade controls on compressors $1,507 $3,280 $1,507
29,093
kWh
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $618 $405 $381
7,358
kWh
$237
-
kW-mo/yr
-
06 2.7135: Install occupancy sensors $760 $1,471 $760
14,666
kWh
- -
TOTAL RECOMMENDED $12,231 $26,083 $8,842
171,108
kWh
$1,694
-
kW-mo/yr
$1,696
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs