ITAC Assessment: UU0051
ITAC logo
ITAC Assessment: UU0051
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product composite structures
NAICS 336415: Guided Missile and Space Vehicle Propulsion Unit and Propulsion Unit Parts Manufacturing
SIC 3764: Guided Missile and Space Vehicle Propulsion Units and Propulsion Unit Parts
Sales Range $100
M
to 500
M
# of Employees 430
Plant Area 480,000
ft2
Annual Production 500
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $246,621 8,891,400
kWh
Electricity Demand $191,103 23,592
kW-mo/yr
Electricity Fees $43,191 -
Natural Gas $95,757 21,818
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,554 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings
01 2.7111: Reduce illumination to minimum necessary levels $6,232 - $2,432
79,900
kWh
$3,800
-
kW-mo/yr
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $744 $340 $466
14,700
kWh
$278
-
kW-mo/yr
- -
03 2.4221: Install compressor air intakes in coolest locations $1,845 $961 $1,208
39,700
kWh
$637
-
kW-mo/yr
- -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,130 $11,800 $4,605
151,300
kWh
$2,525
-
kW-mo/yr
- -
05 2.7442: Keep doors and windows shut when not on use $2,823 - $750
24,700
kWh
$421
-
kW-mo/yr
$1,652
-
MMBtu
-
06 2.2414: Use waste heat from hot flue gases to preheat $1,510 $5,980 - - $1,510
-
MMBtu
-
07 3.4111: Use closed cycle process to minimize waste water production $2,270 $8,450 - - - $2,270
-
Tgal
TOTAL RECOMMENDED $22,554 $27,531 $9,461
310,300
kWh
$7,661
-
kW-mo/yr
$3,162
-
MMBtu
$2,270
-
Tgal
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs