Assessment Year | 2003 |
---|---|
Principal Product | composite structures |
NAICS | 336415: Guided Missile and Space Vehicle Propulsion Unit and Propulsion Unit Parts Manufacturing |
SIC | 3764: Guided Missile and Space Vehicle Propulsion Units and Propulsion Unit Parts |
Sales Range | $100 M to 500M |
# of Employees | 430 |
Plant Area |
480,000
ft2
|
Annual Production | 500
pieces
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Utah |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $246,621 | 8,891,400 |
kWh
|
$0.028 |
Electricity Demand | $191,103 | 23,592 |
kW-mo/yr
|
$8.10 |
Electricity Fees | $43,191 | - |
|
- |
Natural Gas | $95,757 | 21,818 |
MMBtu
|
$4.39 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $22,554 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7111: Reduce illumination to minimum necessary levels | $6,232 | - |
$2,432
79,900
kWh
|
$3,800
-
kW-mo/yr
|
- | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $744 | $340 |
$466
14,700
kWh
|
$278
-
kW-mo/yr
|
- | - | |
03 | 2.4221: Install compressor air intakes in coolest locations | $1,845 | $961 |
$1,208
39,700
kWh
|
$637
-
kW-mo/yr
|
- | - | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $7,130 | $11,800 |
$4,605
151,300
kWh
|
$2,525
-
kW-mo/yr
|
- | - | |
05 | 2.7442: Keep doors and windows shut when not on use | $2,823 | - |
$750
24,700
kWh
|
$421
-
kW-mo/yr
|
$1,652
-
MMBtu
|
- | |
06 | 2.2414: Use waste heat from hot flue gases to preheat | $1,510 | $5,980 | - | - |
$1,510
-
MMBtu
|
- | |
07 | 3.4111: Use closed cycle process to minimize waste water production | $2,270 | $8,450 | - | - | - |
$2,270
-
Tgal
|
|
TOTAL RECOMMENDED | $22,554 | $27,531 |
$9,461
310,300
kWh
|
$7,661
-
kW-mo/yr
|
$3,162
-
MMBtu
|
$2,270
-
Tgal
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs