ITAC Assessment: TR0041
ITAC logo
ITAC Assessment: TR0041
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product injection molding
NAICS 333511: Industrial Mold Manufacturing
SIC 3069: Fabricated Rubber Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 35
Plant Area 30,000
ft2
Annual Production 40,000,000
units
Production Hrs. Annual 7,406
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $216,884 2,101,021
kWh
Electricity Demand $17,366 4,415
kW-mo/yr
Electricity Fees $19,326 -
TOTAL YEARLY COSTS $253,575
RECOMMENDED SAVINGS* $51,834 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $51,834

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $5,679 $3,857 $5,269
51,159
kWh
$409
-
kW-mo/yr
02 2.4226: Use / purchase optimum sized compressor $28,659 $27,941 $28,659
278,243
kWh
-
03 2.4321: Upgrade obsolete equipment $17,496 $200,000 $17,496
169,867
kWh
-
TOTAL RECOMMENDED $51,834 $231,798 $51,425
499,269
kWh
$409
-
kW-mo/yr
TOTAL IMPLEMENTED $51,834 $231,798 $51,425
499,269
kWh
$409
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs