Assessment Year | 2000 |
---|---|
Principal Product | cometic brushes |
NAICS |
n/a
|
SIC | 3991: Brooms and Brushes |
Sales Range | $10 M to 50M |
# of Employees | 125 |
Plant Area |
55,000
ft2
|
Annual Production | 727,500,000
pieces
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Nebraska |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $90,100 | 2,286,929 |
kWh
|
$0.039 |
Electricity Demand | $23,000 | 5,676 |
kW-mo/yr
|
$4.05 |
Natural Gas | $27,900 | 8,152 |
MMBtu
|
$3.42 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $209,166 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $8,334 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings | Personnel Changes Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $364 | - |
$106
2,345
kWh
|
$258
-
kW-mo/yr
|
- | - | - | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $59 | $783 |
$20
293
kWh
|
$39
-
kW-mo/yr
|
- | - | - | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $981 | $264 |
$328
7,327
kWh
|
$653
-
kW-mo/yr
|
- | - | - | - | |
04 | 2.4221: Install compressor air intakes in coolest locations | $436 | $130 |
$144
3,224
kWh
|
$292
-
kW-mo/yr
|
- | - | - | - | |
05 | 2.1213: Direct warmest air to combustion intake | $3,777 | $1,142 | - | - |
$3,777
-
MMBtu
|
- | - | - | |
06 | 3.8142: Distill contaminated solvents for reuse | $2,140 | $9,600 | - | - | - |
$2,140
-
gal
|
- | - | |
07 | 2.8122: Use utility controlled power management | $7,353 | $125 | - | - | - | - | - | $7,353 | |
08 | 4.111: Add equipment/ operators to reduce production bottleneck | $187,200 | $234,048 | - | - | - | - | $187,200 | - | |
09 | 4.231: Purchase equipment instead of leasing | $6,856 | $7,990 | - | - | - | - | - | $6,856 | |
TOTAL RECOMMENDED | $209,166 | $254,082 |
$598
13,189
kWh
|
$1,242
-
kW-mo/yr
|
$3,777
-
MMBtu
|
$2,140
-
gal
|
$187,200 | $14,209 | ||
TOTAL IMPLEMENTED | $8,334 | $389 |
$328
7,327
kWh
|
$653
-
kW-mo/yr
|
- | - | - | $7,353 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings | Personnel Changes Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs