ITAC Assessment: IA0239
ITAC logo
ITAC Assessment: IA0239
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product cometic brushes
NAICS
n/a
SIC 3991: Brooms and Brushes
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area 55,000
ft2
Annual Production 727,500,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Nebraska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $90,100 2,286,929
kWh
Electricity Demand $23,000 5,676
kW-mo/yr
Natural Gas $27,900 8,152
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $209,166 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,334

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Personnel Changes Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $364 - $106
2,345
kWh
$258
-
kW-mo/yr
- - - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $59 $783 $20
293
kWh
$39
-
kW-mo/yr
- - - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $981 $264 $328
7,327
kWh
$653
-
kW-mo/yr
- - - -
04 2.4221: Install compressor air intakes in coolest locations $436 $130 $144
3,224
kWh
$292
-
kW-mo/yr
- - - -
05 2.1213: Direct warmest air to combustion intake $3,777 $1,142 - - $3,777
-
MMBtu
- - -
06 3.8142: Distill contaminated solvents for reuse $2,140 $9,600 - - - $2,140
-
gal
- -
07 2.8122: Use utility controlled power management $7,353 $125 - - - - - $7,353
08 4.111: Add equipment/ operators to reduce production bottleneck $187,200 $234,048 - - - - $187,200 -
09 4.231: Purchase equipment instead of leasing $6,856 $7,990 - - - - - $6,856
TOTAL RECOMMENDED $209,166 $254,082 $598
13,189
kWh
$1,242
-
kW-mo/yr
$3,777
-
MMBtu
$2,140
-
gal
$187,200 $14,209
TOTAL IMPLEMENTED $8,334 $389 $328
7,327
kWh
$653
-
kW-mo/yr
- - - $7,353
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs