ITAC Assessment: UD0896
ITAC logo
ITAC Assessment: UD0896
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Extruded rubber (window seals)
NAICS 326291: Rubber Product Manufacturing for Mechanical Use
SIC 3061: Molded, Extruded, and Lathe-Cut Mechanical Rubber Goods
Sales Range $10
M
to 50
M
# of Employees 68
Plant Area 68,000
ft2
Annual Production 200,000,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $228,232 5,915,817
kWh
Electricity Demand $123,709 10,748
kW-mo/yr
Electricity Fees $10,528 -
Natural Gas $27,509 3,274
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $50,711 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $74

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Other Liquid (non-haz) Savings Personnel Changes Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $74 - $46
1,195
kWh
$28
-
kW-mo/yr
- - - - -
02 2.4113: Install motor voltage controller on lightly loaded motors $31,308 $10,500 $19,608
508,236
kWh
$11,700
-
kW-mo/yr
- - - - -
03 3.4151: Minimize water usage $7,067 $8,000 $622
16,134
kWh
$371
-
kW-mo/yr
- - $3,037
-
Tgal
$3,037
-
gal
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $683 $500 $428
11,084
kWh
$255
-
kW-mo/yr
- - - - -
05 2.4231: Reduce the pressure of compressed air to the minimum required $22 - $139
3,600
kWh
$83
-
kW-mo/yr
- - - - $(-200.0)
06 2.3212: Optimize plant power factor $9,728 $8,000 - - $9,728 - - - -
07 2.2515: Use optimum thickness insulation $1,035 $1,211 $648
16,800
kWh
$387
-
kW-mo/yr
- - - - -
08 2.7231: Use radiant heater for spot heating $794 $1,000 - - - $794
-
MMBtu
- - -
TOTAL RECOMMENDED $50,711 $29,211 $21,491
557,049
kWh
$12,824
-
kW-mo/yr
$9,728 $794
-
MMBtu
$3,037
-
Tgal
$3,037
-
gal
$(-200.0)
TOTAL IMPLEMENTED $74 - $46
1,195
kWh
$28
-
kW-mo/yr
- - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Other Liquid (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs