| Assessment Year | 2016 |
|---|---|
| Principal Product | Anodize, Hardcoat, conversion coatings on aluminum |
| NAICS | 332813: Electroplating, Plating, Polishing, Anodizing, and Coloring |
| SIC | 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring |
| Sales Range | $10 M to 50M |
| # of Employees | 148 |
| Plant Area |
55,750
ft2
|
| Annual Production | 100,000,000
lb
|
| Production Hrs. Annual | 8,736
hrs
|
| Location (State) | Michigan |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $576,647 | 7,987,560 |
kWh
|
$0.072 |
| Natural Gas | $32,206 | 31,475 |
MMBtu
|
$1.02 |
| TOTAL YEARLY COSTS | $608,853 | |||
| RECOMMENDED SAVINGS* | $28,291 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $19,797 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4221: Install compressor air intakes in coolest locations | $695 | $1,500 |
$695
9,651
kWh
|
- | - | |
| 02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,680 | $2,150 |
$4,680
64,995
kWh
|
- | - | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $15,125 | $43,167 |
$13,209
183,456
kWh
|
- | $1,916 | |
| 04 | 2.2511: Insulate bare equipment | $3,084 | $2,000 |
$3,084
42,833
kWh
|
- | - | |
| 05 | 2.2511: Insulate bare equipment | $1,588 | $1,500 |
$1,588
22,050
kWh
|
- | - | |
| 06 | 2.6231: Utilize controls to operate equipment only when needed | $3,119 | $10,000 | - |
$3,119
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $28,291 | $60,317 |
$23,256
322,985
kWh
|
$3,119
-
MMBtu
|
$1,916 | ||
| TOTAL IMPLEMENTED | $19,797 | $46,667 |
$17,881
248,339
kWh
|
- | $1,916 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs