ITAC Assessment: UM0466
ITAC logo
ITAC Assessment: UM0466
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Headliner Assemblies
NAICS 336360: Motor Vehicle Seating and Interior Trim Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $100
M
to 500
M
# of Employees 225
Plant Area 170,000
ft2
Annual Production 710,039
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $192,918 2,391,480
kWh
Natural Gas $33,523 4,364
MMBtu
Other Gas $27,393 1,329
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,804 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,972

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4221: Install compressor air intakes in coolest locations $1,747 $2,000 $1,747
21,839
kWh
-
02 2.2511: Insulate bare equipment $1,801 $1,000 $1,801
22,519
kWh
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $2,784 $1,000 $2,784
34,805
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $12,085 $21,450 $12,085
151,070
kWh
-
05 2.7447: Install vinyl strip / high speed / air curtain doors $387 $400 - $387
-
MMBtu
TOTAL RECOMMENDED $18,804 $25,850 $18,417
230,233
kWh
$387
-
MMBtu
TOTAL IMPLEMENTED $4,972 $2,400 $4,585
57,324
kWh
$387
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs