ITAC Assessment: SF0093
ITAC logo
ITAC Assessment: SF0093
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Breads and Baked Goods
NAICS
n/a
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $1
M
to 5
M
# of Employees 46
Plant Area 35,000
ft2
Annual Production 2,700,000
lb
Production Hrs. Annual 4,160
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $25,340 368,406
kWh
Electricity Demand $18,326 1,476
kW-mo/yr
Natural Gas $49,267 8,214
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,003 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $158

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,591 $10,680 $2,304
33,411
kWh
$1,287
-
kW-mo/yr
-
02 2.4133: Use most efficient type of electric motors $273 $613 $187
2,638
kWh
$86
-
kW-mo/yr
-
03 2.4221: Install compressor air intakes in coolest locations $158 $410 $104
1,465
kWh
$54
-
kW-mo/yr
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $460 $839 $315
4,396
kWh
$145
-
kW-mo/yr
-
05 2.4314: Use synthetic lubricant $69 $155 $45
586
kWh
$24
-
kW-mo/yr
-
06 3.5315: Lease / purchase baler; sell cardboard to recycler $452 $500 - - $452
-
lb
TOTAL RECOMMENDED $5,003 $13,197 $2,955
42,496
kWh
$1,596
-
kW-mo/yr
$452
-
lb
TOTAL IMPLEMENTED $158 $410 $104
1,465
kWh
$54
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs