Assessment Year | 2016 |
---|---|
Principal Product | Wood Moldings and Railings |
NAICS | 321918: Other Millwork (including Flooring) |
SIC | 2431: Millwork |
Sales Range | $5 M to 10M |
# of Employees | 80 |
Plant Area |
168,500
ft2
|
Annual Production | 800,000
units
|
Production Hrs. Annual | 2,080
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $194,264 | 2,595,239 |
kWh
|
$0.075 |
Natural Gas | $45,530 | 11,298 |
MMBtu
|
$4.03 |
TOTAL YEARLY COSTS | $239,794 | |||
RECOMMENDED SAVINGS* | $9,832 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $7,629 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4221: Install compressor air intakes in coolest locations | $361 | $2,000 |
$361
4,823
kWh
|
- | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,842 | $5,500 |
$1,842
24,627
kWh
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,786 | $3,794 |
$4,786
63,986
kWh
|
- | |
04 | 2.7243: Improve air circulation with destratification fans / other methods | $736 | $150 |
$(-43.5)
(-582)
kWh
|
$780
-
MMBtu
|
|
05 | 2.7444: Close holes and openings in building such as broken windows | $2,107 | $7,900 | - |
$2,107
-
MMBtu
|
|
TOTAL RECOMMENDED | $9,832 | $19,344 |
$6,945
92,854
kWh
|
$2,887
-
MMBtu
|
||
TOTAL IMPLEMENTED | $7,629 | $11,844 |
$4,742
63,404
kWh
|
$2,887
-
MMBtu
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs