Assessment Year | 2015 |
---|---|
Principal Product | Automotive interior components |
NAICS | 332111: Iron and Steel Forging |
SIC | 3465: Automotive Stampings |
Sales Range | $50 M to 100M |
# of Employees | 239 |
Plant Area |
150,000
ft2
|
Annual Production | 1,000,000
pieces
|
Production Hrs. Annual | 7,500
hrs
|
Location (State) | Michigan |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $550,000 | 7,560,000 |
kWh
|
$0.073 |
Natural Gas | $160,000 | 18,450 |
MMBtu
|
$8.67 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $48,620 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $19,125 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4239: Eliminate or reduce compressed air usage | $19,380 | $5,000 |
$19,380
266,400
kWh
|
- | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $7,831 | $1,000 |
$7,831
107,280
kWh
|
- | |
03 | 2.4221: Install compressor air intakes in coolest locations | $3,442 | $1,500 |
$3,442
47,312
kWh
|
- | |
04 | 2.2414: Use waste heat from hot flue gases to preheat | $10,115 | $5,400 | - |
$10,115
-
MMBtu
|
|
05 | 2.2437: Recover waste heat from equipment | $7,852 | $4,000 | - |
$7,852
-
MMBtu
|
|
TOTAL RECOMMENDED | $48,620 | $16,900 |
$30,653
420,992
kWh
|
$17,967
-
MMBtu
|
||
TOTAL IMPLEMENTED | $19,125 | $6,500 |
$11,273
154,592
kWh
|
$7,852
-
MMBtu
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs