ITAC Assessment: UM0453
ITAC logo
ITAC Assessment: UM0453
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Automotive interior components
NAICS 332111: Iron and Steel Forging
SIC 3465: Automotive Stampings
Sales Range $50
M
to 100
M
# of Employees 239
Plant Area 150,000
ft2
Annual Production 1,000,000
pieces
Production Hrs. Annual 7,500
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $550,000 7,560,000
kWh
Natural Gas $160,000 18,450
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $48,620 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,125

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4239: Eliminate or reduce compressed air usage $19,380 $5,000 $19,380
266,400
kWh
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $7,831 $1,000 $7,831
107,280
kWh
-
03 2.4221: Install compressor air intakes in coolest locations $3,442 $1,500 $3,442
47,312
kWh
-
04 2.2414: Use waste heat from hot flue gases to preheat $10,115 $5,400 - $10,115
-
MMBtu
05 2.2437: Recover waste heat from equipment $7,852 $4,000 - $7,852
-
MMBtu
TOTAL RECOMMENDED $48,620 $16,900 $30,653
420,992
kWh
$17,967
-
MMBtu
TOTAL IMPLEMENTED $19,125 $6,500 $11,273
154,592
kWh
$7,852
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs