ITAC Assessment: UM0373
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Customer Specific Metal Parts
NAICS 332999: All Other Miscellaneous Fabricated Metal Product Manufacturing
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 59
Plant Area 104,000
ft2
Annual Production 1,500,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $146,146 2,606,600
kWh
Electricity Demand $133,130 10,421
kW-mo/yr
Natural Gas $15,596 1,858
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $35,193 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $20,156 $44,196 $10,883
194,089
kWh
$9,273
-
kW-mo/yr
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $2,961 $200 $2,961
31,689
kWh
- -
03 2.4221: Install compressor air intakes in coolest locations $2,127 $4,000 $1,271
22,664
kWh
$856
-
kW-mo/yr
-
04 2.7135: Install occupancy sensors $870 $828 $870
15,513
kWh
- -
05 2.7444: Close holes and openings in building such as broken windows $5,428 $1,040 - - $5,428
-
MMBtu
06 2.7243: Improve air circulation with destratification fans / other methods $3,651 $6,300 - - $3,651
-
MMBtu
TOTAL RECOMMENDED $35,193 $56,564 $15,985
263,955
kWh
$10,129
-
kW-mo/yr
$9,079
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs