Assessment Year | 2010 |
---|---|
Principal Product | Customer Specific Metal Parts |
NAICS | 332999: All Other Miscellaneous Fabricated Metal Product Manufacturing |
SIC | 3499: Fabricated Metal Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 59 |
Plant Area |
104,000
ft2
|
Annual Production | 1,500,000
pieces
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Michigan |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $146,146 | 2,606,600 |
kWh
|
$0.056 |
Electricity Demand | $133,130 | 10,421 |
kW-mo/yr
|
$12.78 |
Natural Gas | $15,596 | 1,858 |
MMBtu
|
$8.39 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $35,193 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $20,156 | $44,196 |
$10,883
194,089
kWh
|
$9,273
-
kW-mo/yr
|
- | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,961 | $200 |
$2,961
31,689
kWh
|
- | - | |
03 | 2.4221: Install compressor air intakes in coolest locations | $2,127 | $4,000 |
$1,271
22,664
kWh
|
$856
-
kW-mo/yr
|
- | |
04 | 2.7135: Install occupancy sensors | $870 | $828 |
$870
15,513
kWh
|
- | - | |
05 | 2.7444: Close holes and openings in building such as broken windows | $5,428 | $1,040 | - | - |
$5,428
-
MMBtu
|
|
06 | 2.7243: Improve air circulation with destratification fans / other methods | $3,651 | $6,300 | - | - |
$3,651
-
MMBtu
|
|
TOTAL RECOMMENDED | $35,193 | $56,564 |
$15,985
263,955
kWh
|
$10,129
-
kW-mo/yr
|
$9,079
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs