ITAC Assessment: SU0296
ITAC logo
ITAC Assessment: SU0296
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Disposable Thermometer Probe Covers and Light Bulbs
NAICS 334510: Electromedical and Electrotherapeutic Apparatus Manufacturing
SIC 3845: Electromedical and Electrotherapeutic Apparatus
Sales Range $50
M
to 100
M
# of Employees 350
Plant Area 159,430
ft2
Annual Production 390,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $354,944 4,741,865
kWh
Electricity Demand $167,723 11,585
kW-mo/yr
Electricity Fees $8,701 -
Natural Gas $76,275 10,193
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $245,969 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $162,634

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Administrative Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings
01 2.6218: Turn off equipment when not in use $81,934 - $51,537
687,162
kWh
$23,281
-
kW-mo/yr
- $7,116
-
MMBtu
- - -
02 2.4231: Reduce the pressure of compressed air to the minimum required $2,948 - $2,948
39,312
kWh
- - - - - -
03 2.4221: Install compressor air intakes in coolest locations $3,753 $554 $3,753
50,045
kWh
- - - - - -
04 2.7135: Install occupancy sensors $758 $447 $758
10,101
kWh
- - - - - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $540 $793 $197
2,628
kWh
$52
-
kW-mo/yr
- - $291 - -
06 3.1191: Change procedures / equipment / operating conditions $79,942 $129,646 $2,948
39,312
kWh
$3,127
-
kW-mo/yr
- - - $73,867 -
07 3.1191: Change procedures / equipment / operating conditions $71,218 $132,133 $(-18,486.0)
(-246,480)
kWh
$(-6,863.0)
-
kW-mo/yr
- - - - $96,567
08 2.6211: Conserve energy by efficient use of vending machines $373 $732 $373
4,976
kWh
- - - - - -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $2,680 $5,928 $1,884
25,116
kWh
$796
-
kW-mo/yr
- - - - -
10 2.3212: Optimize plant power factor $1,823 $8,254 - - $1,823 - - - -
TOTAL RECOMMENDED $245,969 $278,487 $45,912
612,172
kWh
$20,393
-
kW-mo/yr
$1,823 $7,116
-
MMBtu
$291 $73,867 $96,567
TOTAL IMPLEMENTED $162,634 $130,093 $55,243
736,575
kWh
$26,408
-
kW-mo/yr
- $7,116
-
MMBtu
- $73,867 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Administrative Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs