ITAC Assessment: UM0368
ITAC logo
ITAC Assessment: UM0368
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Truck bodies
NAICS 336211: Motor Vehicle Body Manufacturing
SIC 3713: Truck and Bus Bodies
Sales Range $100
M
to 500
M
# of Employees 318
Plant Area 384,210
ft2
Annual Production 5,500
pieces
Production Hrs. Annual 2,083
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $297,260 6,556,364
kWh
Electricity Demand $197,967 15,991
kW-mo/yr
Natural Gas $410,706 45,515
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $89,436 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $44,687 $124,913 $22,824
503,402
kWh
$21,863
-
kW-mo/yr
- -
02 2.4221: Install compressor air intakes in coolest locations $3,110 $6,000 $1,588
34,355
kWh
$1,522
-
kW-mo/yr
- -
03 2.7135: Install occupancy sensors $2,430 $2,852 $2,430
53,592
kWh
- - -
04 2.7491: Insulate glazing, walls, ceilings, and roofs $34,139 $333,550 - - - $34,139
-
MMBtu
05 2.7447: Install vinyl strip / high speed / air curtain doors $2,327 $574 - - $2,327 -
06 2.7494: Install storm windows and doors $1,579 $8,070 - - - $1,579
-
MMBtu
07 2.2437: Recover waste heat from equipment $1,164 $1,000 - - - $1,164
-
MMBtu
TOTAL RECOMMENDED $89,436 $476,959 $26,842
591,349
kWh
$23,385
-
kW-mo/yr
$2,327 $36,882
-
MMBtu
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs