Assessment Year | 2006 |
---|---|
Principal Product | Automotive parts metal stamping |
NAICS | 336370: Motor Vehicle Metal Stamping |
SIC | 3465: Automotive Stampings |
Sales Range | $50 M to 100M |
# of Employees | 226 |
Plant Area |
125,000
ft2
|
Annual Production | 20,700,000
pieces
|
Production Hrs. Annual | 5,760
hrs
|
Location (State) | Michigan |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $289,949 | 7,848,402 |
kWh
|
$0.037 |
Electricity Demand | $152,872 | 16,226 |
kW-mo/yr
|
$9.42 |
Electricity Fees | $2,520 | - |
|
- |
Natural Gas | $191,164 | 24,281 |
MMBtu
|
$7.87 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $76,201 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $20,943 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7243: Improve air circulation with destratification fans / other methods | $41,312 | $7,600 |
$(-346.0)
(-9,376)
kWh
|
$(-163.0)
-
kW-mo/yr
|
$41,821
-
MMBtu
|
|
02 | 2.2437: Recover waste heat from equipment | $9,991 | $1,000 | - | - |
$9,991
-
MMBtu
|
|
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,381 | $1,500 |
$4,167
112,807
kWh
|
$2,214
-
kW-mo/yr
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,195 | $7,724 |
$2,769
74,964
kWh
|
$2,426
-
kW-mo/yr
|
- | |
05 | 2.7447: Install vinyl strip / high speed / air curtain doors | $4,420 | $1,500 | - | - |
$4,420
-
MMBtu
|
|
06 | 2.4221: Install compressor air intakes in coolest locations | $4,331 | $2,000 |
$2,829
76,580
kWh
|
$1,502
-
kW-mo/yr
|
- | |
07 | 2.7444: Close holes and openings in building such as broken windows | $4,184 | $845 | - | - |
$4,184
-
MMBtu
|
|
08 | 2.7447: Install vinyl strip / high speed / air curtain doors | $387 | $25 | - | - |
$387
-
MMBtu
|
|
TOTAL RECOMMENDED | $76,201 | $22,194 |
$9,419
254,975
kWh
|
$5,979
-
kW-mo/yr
|
$60,803
-
MMBtu
|
||
TOTAL IMPLEMENTED | $20,943 | $3,370 |
$4,167
112,807
kWh
|
$2,214
-
kW-mo/yr
|
$14,562
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs