ITAC Assessment: MS0351
ITAC logo
ITAC Assessment: MS0351
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Diammonium phosphate fertilizer
NAICS 325312: Phosphatic Fertilizer Manufacturing
SIC 2874: Phosphatic Fertilizers
Sales Range $100
M
to 500
M
# of Employees 249
Plant Area 120,000,000
ft2
Annual Production 600,000
ton
Production Hrs. Annual 8,760
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,071,656 84,571,276
kWh
Electricity Demand $718,634 138,575
kW-mo/yr
Electricity Fees $4,971,242 -
Natural Gas $1,162,621 287,526
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $243,780 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $134,126

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $104,520 $29,318 $102,975
1,566,707
kWh
- $1,545 -
02 2.2135: Repair and eliminate steam leaks $80,833 $872 - - - $80,833
-
MMBtu
03 2.8123: Pay utility bills on time $36,706 - - - $36,706 -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $16,587 $322 $16,342
248,646
kWh
- $245 -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $5,134 $210 $4,502
68,498
kWh
$556
-
kW-mo/yr
$76 -
TOTAL RECOMMENDED $243,780 $30,722 $123,819
1,883,851
kWh
$556
-
kW-mo/yr
$38,572 $80,833
-
MMBtu
TOTAL IMPLEMENTED $134,126 $1,194 $16,342
248,646
kWh
- $36,951 $80,833
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs