ITAC Assessment: OD0136
ITAC logo
ITAC Assessment: OD0136
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product General Sawmill
NAICS
n/a
SIC 2421: Sawmills and Planing Mills, General
Sales Range $1
M
to 5
M
# of Employees 30
Plant Area 30,000
ft2
Annual Production 0
units
Production Hrs. Annual 2,295
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $69,616 1,126,026
kWh
Electricity Demand $16,444 6,839
kW-mo/yr
Electricity Fees $3,081 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,977 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,937

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $232 $862 $189
2,931
kWh
$43
-
kW-mo/yr
-
02 2.7122: Disconnect ballasts $1,083 $8,452 $573
9,379
kWh
$510
-
kW-mo/yr
-
03 2.7135: Install occupancy sensors $784 $1,027 $784
12,603
kWh
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $622 $800 $622
9,965
kWh
- -
05 2.7224: Reduce space conditioning during non-working hours $1,069 $1,870 $886
14,361
kWh
$183
-
kW-mo/yr
-
06 2.4113: Install motor voltage controller on lightly loaded motors $7,187 $2,200 - - $7,187
TOTAL RECOMMENDED $10,977 $15,211 $3,054
49,239
kWh
$736
-
kW-mo/yr
$7,187
TOTAL IMPLEMENTED $1,937 $10,114 $1,384
22,275
kWh
$553
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs