ITAC Assessment: UM0291
ITAC logo
ITAC Assessment: UM0291
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Piston Rings
NAICS 336310: Motor Vehicle Gasoline Engine and Engine Parts Manufacturing
SIC 3592: Carburetors, Pistons, Piston Rings, and Valves
Sales Range $50
M
to 100
M
# of Employees 320
Plant Area 150,000
ft2
Annual Production 120,000,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $607,091 16,603,459
kWh
Electricity Demand $283,844 34,138
kW-mo/yr
Electricity Fees $13,123 -
Natural Gas $332,223 42,942
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $53,247 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $29,563

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Consumption Savings
01 2.2437: Recover waste heat from equipment $20,293 $9,000 - - $20,293
-
MMBtu
-
02 3.4111: Use closed cycle process to minimize waste water production $18,138 $19,073 $(-1,091.0)
(-29,828)
kWh
$(-1,487.0)
-
kW-mo/yr
- $20,716
-
Tgal
03 2.2514: Cover open tanks $4,518 $2,366 - - $4,421
-
MMBtu
$97
-
Tgal
04 2.4221: Install compressor air intakes in coolest locations $3,427 $1,900 $1,795
49,098
kWh
$1,632
-
kW-mo/yr
- -
05 2.2437: Recover waste heat from equipment $2,841 $1,490 $(-16.0)
(-298)
kWh
- $2,857
-
MMBtu
-
06 2.7493: Use double or triple glazed windows to maintain higher relative humidity and to reduce heat losses $2,309 $39,000 $537
14,688
kWh
- $1,772
-
MMBtu
-
07 2.7447: Install vinyl strip / high speed / air curtain doors $1,325 $1,265 - - $1,325
-
MMBtu
-
08 2.7135: Install occupancy sensors $396 $150 $396
10,836
kWh
- - -
TOTAL RECOMMENDED $53,247 $74,244 $1,621
44,496
kWh
$145
-
kW-mo/yr
$30,668
-
MMBtu
$20,813
-
Tgal
TOTAL IMPLEMENTED $29,563 $14,531 $1,795
49,098
kWh
$1,632
-
kW-mo/yr
$26,039
-
MMBtu
$97
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs