ITAC Assessment: UM0287
ITAC logo
ITAC Assessment: UM0287
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Interior Door Panels,Interior Dashboards,Interior Flooring
NAICS 336390: Other Motor Vehicle Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $100
M
to 500
M
# of Employees 683
Plant Area 348,000
ft2
Annual Production 3,936,831
pieces
Production Hrs. Annual 5,760
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,299,669 23,587,000
kWh
Electricity Demand $643,405 44,880
kW-mo/yr
Electricity Fees $1,954 -
Natural Gas $229,809 26,436
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $282,015 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $66,642

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $208,751 $887,900 $348,810
6,342,000
kWh
$181,889
-
kW-mo/yr
$(-321,948.0)
-
MMBtu
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $22,506 $675 $14,793
268,954
kWh
$7,713
-
kW-mo/yr
-
03 2.2437: Recover waste heat from equipment $17,467 $1,200 - - $17,467
-
MMBtu
04 2.7447: Install vinyl strip / high speed / air curtain doors $9,493 $8,770 - - $9,493
-
MMBtu
05 2.7142: Utilize higher efficiency lamps and/or ballasts $6,726 $13,103 $3,484
63,244
kWh
$3,242
-
kW-mo/yr
-
06 2.2511: Insulate bare equipment $6,622 $206 $3,008
54,600
kWh
$3,614
-
kW-mo/yr
-
07 2.4221: Install compressor air intakes in coolest locations $6,116 $1,000 $4,022
73,093
kWh
$2,094
-
kW-mo/yr
-
08 2.2531: Re-size charging openings or add movable cover or door $4,334 $1,250 - - $4,334
-
MMBtu
TOTAL RECOMMENDED $282,015 $914,104 $374,117
6,801,891
kWh
$198,552
-
kW-mo/yr
$(-290,654.0)
-
MMBtu
TOTAL IMPLEMENTED $66,642 $25,998 $22,299
405,291
kWh
$13,049
-
kW-mo/yr
$31,294
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs