Assessment Year | 2005 |
---|---|
Principal Product | Automotive Testing Equipment |
NAICS | 336350: Motor Vehicle Transmission and Power Train Parts Manufacturing |
SIC | 3714: Motor Vehicle Parts and Accessories |
Sales Range | $10 M to 50M |
# of Employees | 157 |
Plant Area |
130,000
ft2
|
Annual Production | 80
pieces
|
Production Hrs. Annual | 4,680
hrs
|
Location (State) | Michigan |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $73,304 | 2,043,805 |
kWh
|
$0.036 |
Electricity Demand | $56,579 | 5,804 |
kW-mo/yr
|
$9.75 |
Electricity Fees | $2,935 | - |
|
- |
Natural Gas | $29,280 | 3,860 |
MMBtu
|
$7.59 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $27,288 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $8,859 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $9,539 | $27,000 |
$922
14,177
kWh
|
- |
$8,617
-
MMBtu
|
|
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,301 | $13,476 |
$3,588
100,038
kWh
|
$2,713
-
kW-mo/yr
|
- | |
03 | 2.7447: Install vinyl strip / high speed / air curtain doors | $3,775 | $1,900 |
$283
4,349
kWh
|
- |
$3,492
-
MMBtu
|
|
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,376 | $450 |
$2,079
57,908
kWh
|
$1,297
-
kW-mo/yr
|
- | |
05 | 2.2437: Recover waste heat from equipment | $1,619 | $500 | - | - |
$1,619
-
MMBtu
|
|
06 | 2.7124: Make a practice of turning off lights when not needed | $1,608 | $75 |
$969
26,997
kWh
|
$639
-
kW-mo/yr
|
- | |
07 | 2.7135: Install occupancy sensors | $618 | $736 |
$618
17,203
kWh
|
- | - | |
08 | 2.4221: Install compressor air intakes in coolest locations | $352 | $1,000 |
$215
5,978
kWh
|
$137
-
kW-mo/yr
|
- | |
09 | 2.7444: Close holes and openings in building such as broken windows | $100 | $45 |
$11
176
kWh
|
- |
$89
-
MMBtu
|
|
TOTAL RECOMMENDED | $27,288 | $45,182 |
$8,685
226,826
kWh
|
$4,786
-
kW-mo/yr
|
$13,817
-
MMBtu
|
||
TOTAL IMPLEMENTED | $8,859 | $2,470 |
$3,342
89,430
kWh
|
$1,936
-
kW-mo/yr
|
$3,581
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs