ITAC Assessment: OK1165
ITAC logo
ITAC Assessment: OK1165
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Pneumatically-driven nails
NAICS 332618: Other Fabricated Wire Product Manufacturing
SIC 3315: Steel Wiredrawing and Steel Nails and Spikes
Sales Range $10
M
to 50
M
# of Employees 40
Plant Area 125,000
ft2
Annual Production 2,650
ton
Production Hrs. Annual 1,920
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $212,335 3,515,400
kWh
Electricity Demand $129,010 14,632
kW-mo/yr
Natural Gas $72,546 9,022
MMBtu
Waste Disposal Costs
Water Usage $19,600 4,155
Tgal
Water Disposal $8,546 3,408
Tgal
TOTAL YEARLY COSTS $442,037
RECOMMENDED SAVINGS* $39,349 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7211: Clean and maintain refrigerant condensers and towers $294 $935 $294
4,900
kWh
-
02 2.7226: Use computer programs to optimize hvac performance $2,462 $8,120 $2,462
41,038
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $9,988 $13,005 $9,988
166,464
kWh
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $25,293 $40,074 $25,293
421,551
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,312 $7,084 $739
12,306
kWh
$573
-
kW-mo/yr
TOTAL RECOMMENDED $39,349 $69,218 $38,776
646,259
kWh
$573
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs