ITAC Assessment: UM0274
ITAC logo
ITAC Assessment: UM0274
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Carbon and Alloy Steel Forgings
NAICS 332111: Iron and Steel Forging
SIC 3462: Iron and Steel Forgings
Sales Range $10
M
to 50
M
# of Employees 52
Plant Area 89,800
ft2
Annual Production 37,804,000
lb
Production Hrs. Annual 5,610
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $484,999 6,229,305
kWh
Electricity Fees $2,271 -
Natural Gas $91,099 12,437
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $57,256 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,242

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $42,936 $135,000 $42,936
550,473
kWh
-
02 2.2437: Recover waste heat from equipment $5,622 $2,000 - $5,622
-
MMBtu
03 2.7124: Make a practice of turning off lights when not needed $3,242 - $3,242
41,561
kWh
-
04 2.6231: Utilize controls to operate equipment only when needed $2,966 $200 $2,966
38,031
kWh
-
05 2.7243: Improve air circulation with destratification fans / other methods $1,699 $700 - $1,699
-
MMBtu
06 2.4239: Eliminate or reduce compressed air usage $791 $2,000 - $791
-
MMBtu
TOTAL RECOMMENDED $57,256 $139,900 $49,144
630,065
kWh
$8,112
-
MMBtu
TOTAL IMPLEMENTED $3,242 - $3,242
41,561
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs