Assessment Year | 2011 |
---|---|
Principal Product | Auto Parts |
NAICS | 333415: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipmen |
SIC | 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment |
Sales Range | greater than $500 M |
# of Employees | 700 |
Plant Area |
800,000
ft2
|
Annual Production | 12,000,000
pieces
|
Production Hrs. Annual | 4,000
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,890,886 | 30,432,000 |
kWh
|
$0.062 |
Electricity Demand | $790,429 | 66,800 |
kW-mo/yr
|
$11.83 |
Electricity Fees | $(-169,155.0) | - |
|
- |
Natural Gas | $128,564 | 21,611 |
MMBtu
|
$5.95 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $179,605 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $85,755 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $33,855 | $61,400 |
$20,900
347,500
kWh
|
$7,455
-
kW-mo/yr
|
- | $5,500 | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,100 | $5,000 |
$3,100
42,924
kWh
|
- | - | - | |
03 | 2.2511: Insulate bare equipment | $48,800 | $37,500 |
$48,800
675,854
kWh
|
- | - | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $25,250 | $7,500 |
$25,250
420,705
kWh
|
- | - | - | |
05 | 2.4226: Use / purchase optimum sized compressor | $52,200 | $95,100 |
$36,000
599,283
kWh
|
$16,200
-
kW-mo/yr
|
- | - | |
06 | 2.2437: Recover waste heat from equipment | $6,100 | $12,000 | - | - |
$6,100
-
MMBtu
|
- | |
07 | 2.3212: Optimize plant power factor | $10,300 | $21,000 | - |
$10,300
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $179,605 | $239,500 |
$134,050
2,086,266
kWh
|
$33,955
-
kW-mo/yr
|
$6,100
-
MMBtu
|
$5,500 | ||
TOTAL IMPLEMENTED | $85,755 | $103,900 |
$72,800
1,066,278
kWh
|
$7,455
-
kW-mo/yr
|
- | $5,500 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs