| Assessment Year | 2004 |
|---|---|
| Principal Product | Hard Packed Ice Cream |
| NAICS | 311514: Dry, Condensed, and Evaporated Dairy Product Manufacturing |
| SIC | 2024: Ice Cream and Frozen Desserts |
| Sales Range | $10 M to 50M |
| # of Employees | 140 |
| Plant Area |
150,000
ft2
|
| Annual Production | 6,000
Tgal
|
| Production Hrs. Annual | 4,750
hrs
|
| Location (State) | Ohio |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $255,472 | 5,245,101 |
kWh
|
$0.049 |
| Electricity Demand | $102,817 | 11,418 |
kW-mo/yr
|
$9.00 |
| Electricity Fees | $3,016 | - |
|
- |
| Natural Gas | $81,232 | 8,443 |
MMBtu
|
$9.62 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $9,231 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $5,459 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.2437: Recover waste heat from equipment | $2,828 | $1,000 | - | - |
$2,828
-
MMBtu
|
|
| 02 | 2.6231: Utilize controls to operate equipment only when needed | $2,313 | $3,000 |
$2,313
47,500
kWh
|
- | - | |
| 03 | 2.7447: Install vinyl strip / high speed / air curtain doors | $2,631 | $300 |
$2,631
37,578
kWh
|
- | - | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,459 | $5,009 |
$995
20,425
kWh
|
$464
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $9,231 | $9,309 |
$5,939
105,503
kWh
|
$464
-
kW-mo/yr
|
$2,828
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $5,459 | $1,300 |
$2,631
37,578
kWh
|
- |
$2,828
-
MMBtu
|
||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs