ITAC Assessment: UM0272
ITAC logo
ITAC Assessment: UM0272
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Hard Packed Ice Cream
NAICS 311514: Dry, Condensed, and Evaporated Dairy Product Manufacturing
SIC 2024: Ice Cream and Frozen Desserts
Sales Range $10
M
to 50
M
# of Employees 140
Plant Area 150,000
ft2
Annual Production 6,000
Tgal
Production Hrs. Annual 4,750
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $255,472 5,245,101
kWh
Electricity Demand $102,817 11,418
kW-mo/yr
Electricity Fees $3,016 -
Natural Gas $81,232 8,443
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,231 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,459

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2437: Recover waste heat from equipment $2,828 $1,000 - - $2,828
-
MMBtu
02 2.6231: Utilize controls to operate equipment only when needed $2,313 $3,000 $2,313
47,500
kWh
- -
03 2.7447: Install vinyl strip / high speed / air curtain doors $2,631 $300 $2,631
37,578
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,459 $5,009 $995
20,425
kWh
$464
-
kW-mo/yr
-
TOTAL RECOMMENDED $9,231 $9,309 $5,939
105,503
kWh
$464
-
kW-mo/yr
$2,828
-
MMBtu
TOTAL IMPLEMENTED $5,459 $1,300 $2,631
37,578
kWh
- $2,828
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs