ITAC Assessment: DS0134
ITAC logo
ITAC Assessment: DS0134
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Corrugated Shipping Containers and Displays
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area 150,000
ft2
Annual Production 216,000
thousand feet
Production Hrs. Annual 5,720
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $56,327 1,817,702
kWh
Electricity Demand $40,564 5,484
kW-mo/yr
Electricity Fees $8,746 -
Natural Gas $6,731 1,219
MMBtu
LPG $9,600 2,220
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,751 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,318

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,978 $161 $1,983
63,892
kWh
$995
-
kW-mo/yr
- - -
02 2.3212: Optimize plant power factor $1,209 $1,750 - - $1,209 - -
03 2.4221: Install compressor air intakes in coolest locations $885 $625 $592
19,050
kWh
$293
-
kW-mo/yr
- - -
04 2.7261: Install timers and/or thermostats $787 $1,551 - - - $787
-
MMBtu
-
05 3.5316: Contract a wood pallet recycling company $455 $240 - - - - $455
06 4.211: Consider use / purchase of bulk materials where possible $8,437 $1,350 - - - - $8,437
TOTAL RECOMMENDED $14,751 $5,677 $2,575
82,942
kWh
$1,288
-
kW-mo/yr
$1,209 $787
-
MMBtu
$8,892
TOTAL IMPLEMENTED $4,318 $1,026 $2,575
82,942
kWh
$1,288
-
kW-mo/yr
- - $455
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs