Assessment Year | 2003 |
---|---|
Principal Product | Aluminum extrusions |
NAICS | 331318: Other Aluminum Rolling, Drawing, and Extruding |
SIC | 3354: Aluminum Extruded Products |
Sales Range | $10 M to 50M |
# of Employees | 65 |
Plant Area |
111,745
ft2
|
Annual Production | 1,058,000
lb
|
Production Hrs. Annual | 4,420
hrs
|
Location (State) | Michigan |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $83,788 | 1,923,963 |
kWh
|
$0.044 |
Electricity Demand | $48,444 | 8,448 |
kW-mo/yr
|
$5.73 |
Electricity Fees | $3,005 | - |
|
- |
Natural Gas | $57,131 | 12,382 |
MMBtu
|
$4.61 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $40,284 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $9,640 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.2437: Recover waste heat from equipment | $9,930 | $1,000 | - | - |
$9,930
-
MMBtu
|
|
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $8,000 | $1,725 |
$5,736
131,720
kWh
|
$2,264
-
kW-mo/yr
|
- | |
03 | 2.2711: Utilize outside air instead of conditioned air for drying | $5,893 | $10,000 |
$5,432
26,845
kWh
|
$461
-
kW-mo/yr
|
- | |
04 | 2.2437: Recover waste heat from equipment | $7,016 | $1,920 | - | - |
$7,016
-
MMBtu
|
|
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,702 | $19,995 |
$3,727
85,575
kWh
|
$975
-
kW-mo/yr
|
- | |
06 | 2.4221: Install compressor air intakes in coolest locations | $2,800 | $1,000 |
$2,006
46,061
kWh
|
$794
-
kW-mo/yr
|
- | |
07 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,640 | $1,300 | - | - |
$1,640
-
MMBtu
|
|
08 | 2.7243: Improve air circulation with destratification fans / other methods | $303 | $700 | - | - |
$303
-
MMBtu
|
|
TOTAL RECOMMENDED | $40,284 | $37,640 |
$16,901
290,201
kWh
|
$4,494
-
kW-mo/yr
|
$18,889
-
MMBtu
|
||
TOTAL IMPLEMENTED | $9,640 | $3,025 |
$5,736
131,720
kWh
|
$2,264
-
kW-mo/yr
|
$1,640
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs