ITAC Assessment: SD0237
ITAC logo
ITAC Assessment: SD0237
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Wine
NAICS
n/a
SIC 2084: Wines, Brandy, and Brandy Spirits
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 100,000
ft2
Annual Production 350,000
pieces
Production Hrs. Annual 2,000
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $81,249 1,105,510
kWh
Electricity Demand $33,702 3,383
kW-mo/yr
Electricity Fees $844 -
Natural Gas $9,654 1,948
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $108,966 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $73,699

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Water Consumption Savings
01 2.2628: Utilize a less expensive cooling method $28,985 $88,000 $48,030
651,817
kWh
$8,084
-
kW-mo/yr
$(-27,129.0)
-
MMBtu
- - -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,408 $2,800 $2,214
30,188
kWh
$194
-
kW-mo/yr
- - - -
03 2.1241: Reduce excessive boiler blowdown $688 $100 - - $688
-
MMBtu
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $3,766 $9,903 $2,539
34,584
kWh
$1,227
-
kW-mo/yr
- - - -
05 2.7144: Install spectral reflectors / delamp $4,525 $6,910 $3,072
41,618
kWh
$1,453
-
kW-mo/yr
- - - -
06 3.6193: Install equipment (eg compactor) to reduce disposal costs $6,740 $8,500 - - - - $6,740 -
07 3.4151: Minimize water usage $646 $100 - - - - - $646
-
Tgal
08 4.441: Install automatic packing equipment $40,972 $7,200 - - - $40,972 - -
09 4.441: Install automatic packing equipment $20,236 $26,000 - - - $20,236 - -
TOTAL RECOMMENDED $108,966 $149,513 $55,855
758,207
kWh
$10,958
-
kW-mo/yr
$(-26,441.0)
-
MMBtu
$61,208 $6,740 $646
-
Tgal
TOTAL IMPLEMENTED $73,699 $98,200 $50,244
682,005
kWh
$8,278
-
kW-mo/yr
$(-26,441.0)
-
MMBtu
$40,972 - $646
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs