ITAC Assessment: UM0226
ITAC logo
ITAC Assessment: UM0226
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Automotive Stampings and Assemblies
NAICS 336370: Motor Vehicle Metal Stamping
SIC 3465: Automotive Stampings
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 86,800
ft2
Annual Production 27,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $72,963 2,883,160
kWh
Electricity Demand $118,790 6,516
kW-mo/yr
Electricity Fees $4,162 -
Natural Gas $11,005 2,045
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $34,556 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $7,808 $16,880 n/a $1,159
39,162
kWh
$6,649
-
kW-mo/yr
- -
02 2.4224: Upgrade controls on compressors $5,200 $75 $2,500
98,694
kWh
$2,700
-
kW-mo/yr
- -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,770 $800 $4,770
188,453
kWh
- - -
04 2.7243: Improve air circulation with destratification fans / other methods $3,631 $1,050 $(-53.0)
(-2,100)
kWh
- - $3,684
-
MMBtu
05 2.2437: Recover waste heat from equipment $4,160 $500 - - - $4,160
-
MMBtu
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,111 $375 $1,014
40,064
kWh
$1,097
-
kW-mo/yr
- -
07 2.3212: Optimize plant power factor $2,055 $1,560 - - $2,055 -
08 2.4221: Install compressor air intakes in coolest locations $1,722 $1,000 $827
32,664
kWh
$895
-
kW-mo/yr
- -
09 2.7446: Utilize sensors controlling roof and wall openings $1,207 $600 - - - $1,207
-
MMBtu
10 2.7446: Utilize sensors controlling roof and wall openings $724 $400 - - - $724
-
MMBtu
11 2.4323: Use optimum size and capacity equipment $1,004 $2,200 $411
16,234
kWh
$593
-
kW-mo/yr
- -
12 2.4111: Utilize energy-efficient belts and other improved mechanisms $164 - $79
3,112
kWh
$85
-
kW-mo/yr
- -
TOTAL RECOMMENDED $34,556 $25,440 $10,707
416,283
kWh
$12,019
-
kW-mo/yr
$2,055 $9,775
-
MMBtu
TOTAL IMPLEMENTED - - - - - -