Assessment Year | 2016 |
---|---|
Principal Product | Speed reducers |
NAICS | 333612: Speed Changer, Industrial High-Speed Drive, and Gear Manufacturing |
SIC | 3566: Speed Changers, Industrial High-Speed Drives, and Gears |
Sales Range | $100 M to 500M |
# of Employees | 300 |
Plant Area |
250,000
ft2
|
Annual Production | 50,000
pieces
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | South Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $736,867 | 18,288,000 |
kWh
|
$0.040 |
Electricity Demand | $409,227 | 34,473 |
kW-mo/yr
|
$11.87 |
Natural Gas | $42,929 | 6,382 |
MMBtu
|
$6.73 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $112,033 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $60,828 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7241: Install outside air damper / economizer on hvac unit | $35,613 | $105,000 |
$35,613
883,700
kWh
|
- | - | - | |
02 | 2.2437: Recover waste heat from equipment | $15,200 | $4,000 |
$15,200
377,178
kWh
|
- | - | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $8,460 | $200 |
$6,584
163,374
kWh
|
$2,656
-
kW-mo/yr
|
$(-300.0) | $(-480.0) | |
04 | 2.4239: Eliminate or reduce compressed air usage | $17,627 | $1,000 |
$11,093
275,250
kWh
|
$6,534
-
kW-mo/yr
|
- | - | |
05 | 2.4226: Use / purchase optimum sized compressor | $12,243 | $26,000 |
$12,243
303,800
kWh
|
- | - | - | |
06 | 2.4239: Eliminate or reduce compressed air usage | $4,027 | $500 |
$2,534
62,880
kWh
|
$1,493
-
kW-mo/yr
|
- | - | |
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $5,287 | $100 |
$3,767
93,468
kWh
|
$1,520
-
kW-mo/yr
|
- | - | |
08 | 2.4239: Eliminate or reduce compressed air usage | $4,436 | $6,000 |
$4,436
110,065
kWh
|
- | - | - | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $812 | $300 |
$258
6,412
kWh
|
$105
-
kW-mo/yr
|
- | $449 | |
10 | 2.7135: Install occupancy sensors | $519 | $521 |
$519
12,870
kWh
|
- | - | - | |
11 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $474 | $455 |
$384
9,527
kWh
|
- | - | $90 | |
12 | 2.7134: Use photocell controls | $194 | $250 |
$194
4,818
kWh
|
- | - | - | |
13 | 2.6218: Turn off equipment when not in use | $3,597 | $500 |
$3,597
89,250
kWh
|
- | - | - | |
14 | 2.4151: Develop a repair/replace policy | $2,514 | $5,865 |
$1,582
39,257
kWh
|
$932
-
kW-mo/yr
|
- | - | |
15 | 2.3132: Recharge batteries on during off-peak demand periods | $1,030 | $200 |
$1,030
-
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $112,033 | $150,891 |
$99,034
2,431,849
kWh
|
$13,240
-
kW-mo/yr
|
$(-300.0) | $59 | ||
TOTAL IMPLEMENTED | $60,828 | $38,791 |
$51,396
1,275,324
kWh
|
$10,122
-
kW-mo/yr
|
$(-300.0) | $(-390.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs