Assessment Year | 2002 |
---|---|
Principal Product | Corrugated packaging products |
NAICS |
n/a
|
SIC | 2653: Corrugated and Solid Fiber Boxes |
Sales Range | $10 M to 50M |
# of Employees | 102 |
Plant Area |
70,000
ft2
|
Annual Production | 100,000
thousand feet
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Michigan |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $50,007 | 1,097,095 |
kWh
|
$0.046 |
Electricity Demand | $30,734 | 2,700 |
kW-mo/yr
|
$11.38 |
Electricity Fees | $3,197 | - |
|
- |
Natural Gas | $14,689 | 3,515 |
MMBtu
|
$4.18 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $46,528 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $20,519 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (haz) Savings |
---|---|---|---|---|---|---|---|---|
01 | 3.6121: Burn waste paper for heat | $25,568 | $92,625 | - | - |
$14,693
-
MMBtu
|
$10,875
-
lb
|
|
02 | 2.4112: Install soft-start to eliminate nuisance trips | $10,900 | $4,200 |
$10,900
307,737
kWh
|
- | - | - | |
03 | 2.7447: Install vinyl strip / high speed / air curtain doors | $5,317 | $2,352 | - | - |
$5,317
-
MMBtu
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,138 | $3,838 |
$1,518
33,300
kWh
|
$620
-
kW-mo/yr
|
- | - | |
05 | 2.7132: Install timers on light switches in little used areas | $718 | $100 |
$718
15,756
kWh
|
- | - | - | |
06 | 2.2437: Recover waste heat from equipment | $543 | $500 | - | - |
$543
-
MMBtu
|
- | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $520 | $375 |
$381
8,352
kWh
|
$139
-
kW-mo/yr
|
- | - | |
08 | 2.4231: Reduce the pressure of compressed air to the minimum required | $441 | $200 |
$343
7,533
kWh
|
$98
-
kW-mo/yr
|
- | - | |
09 | 2.4221: Install compressor air intakes in coolest locations | $383 | $600 |
$278
6,101
kWh
|
$105
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $46,528 | $104,790 |
$14,138
378,779
kWh
|
$962
-
kW-mo/yr
|
$20,553
-
MMBtu
|
$10,875
-
lb
|
||
TOTAL IMPLEMENTED | $20,519 | $11,965 |
$13,795
371,246
kWh
|
$864
-
kW-mo/yr
|
$5,860
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs