ITAC Assessment: UM0195
ITAC logo
ITAC Assessment: UM0195
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Steel fabrications
NAICS
n/a
SIC 3441: Fabricated Structural Metal
Sales Range $1
M
to 5
M
# of Employees 22
Plant Area 60,000
ft2
Annual Production 5,000,000
ton
Production Hrs. Annual 4,335
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $19,810 545,296
kWh
Electricity Demand $21,273 2,148
kW-mo/yr
Electricity Fees $1,348 -
Natural Gas $28,860 7,258
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,479 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,511

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7243: Improve air circulation with destratification fans / other methods $4,400 $3,150 - - $4,400
-
MMBtu
02 2.7447: Install vinyl strip / high speed / air curtain doors $329 $500 - - $329
-
MMBtu
03 2.4221: Install compressor air intakes in coolest locations $755 $1,000 $433
11,940
kWh
$322
-
kW-mo/yr
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,182 $375 $738
20,334
kWh
$444
-
kW-mo/yr
-
05 2.4239: Eliminate or reduce compressed air usage $551 $500 $313
8,635
kWh
$238
-
kW-mo/yr
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $262 $1,052 $141
3,876
kWh
$121
-
kW-mo/yr
-
TOTAL RECOMMENDED $7,479 $6,577 $1,625
44,785
kWh
$1,125
-
kW-mo/yr
$4,729
-
MMBtu
TOTAL IMPLEMENTED $1,511 $875 $738
20,334
kWh
$444
-
kW-mo/yr
$329
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs