Assessment Year | 2001 |
---|---|
Principal Product | Steel fabrications |
NAICS |
n/a
|
SIC | 3441: Fabricated Structural Metal |
Sales Range | $1 M to 5M |
# of Employees | 22 |
Plant Area |
60,000
ft2
|
Annual Production | 5,000,000
ton
|
Production Hrs. Annual | 4,335
hrs
|
Location (State) | Michigan |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $19,810 | 545,296 |
kWh
|
$0.036 |
Electricity Demand | $21,273 | 2,148 |
kW-mo/yr
|
$9.90 |
Electricity Fees | $1,348 | - |
|
- |
Natural Gas | $28,860 | 7,258 |
MMBtu
|
$3.98 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $7,479 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $1,511 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7243: Improve air circulation with destratification fans / other methods | $4,400 | $3,150 | - | - |
$4,400
-
MMBtu
|
|
02 | 2.7447: Install vinyl strip / high speed / air curtain doors | $329 | $500 | - | - |
$329
-
MMBtu
|
|
03 | 2.4221: Install compressor air intakes in coolest locations | $755 | $1,000 |
$433
11,940
kWh
|
$322
-
kW-mo/yr
|
- | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,182 | $375 |
$738
20,334
kWh
|
$444
-
kW-mo/yr
|
- | |
05 | 2.4239: Eliminate or reduce compressed air usage | $551 | $500 |
$313
8,635
kWh
|
$238
-
kW-mo/yr
|
- | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $262 | $1,052 |
$141
3,876
kWh
|
$121
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $7,479 | $6,577 |
$1,625
44,785
kWh
|
$1,125
-
kW-mo/yr
|
$4,729
-
MMBtu
|
||
TOTAL IMPLEMENTED | $1,511 | $875 |
$738
20,334
kWh
|
$444
-
kW-mo/yr
|
$329
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs