ITAC Assessment: OR0375
ITAC logo
ITAC Assessment: OR0375
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Lighting Fixtures
NAICS
n/a
SIC 3648: Lighting Equipment, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 600
Plant Area 264,000
ft2
Annual Production 725,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $314,463 7,505,569
kWh
Electricity Demand $39,405 249,105
kW-mo/yr
Electricity Fees $3,094 -
Natural Gas $150,915 49,551
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $174,213 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $78,110

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Primary Raw Material Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $29,778 $20,000 $27,723
661,782
kWh
$2,055
-
kW-mo/yr
- - - -
02 2.4231: Reduce the pressure of compressed air to the minimum required $2,770 - $2,570
61,254
kWh
$200
-
kW-mo/yr
- - - -
03 2.3212: Optimize plant power factor $2,848 $9,500 - - $2,848 - - -
04 3.1192: Reduce scrap production $81,000 $21,000 - - - - - $81,000
05 3.5112: Reprocess spent oils on site for re-use $45,562 $2,451 - - - $1,512
-
gal
- $44,050
06 3.1192: Reduce scrap production $12,255 - - - - - $12,255
-
lb
-
TOTAL RECOMMENDED $174,213 $52,951 $30,293
723,036
kWh
$2,255
-
kW-mo/yr
$2,848 $1,512
-
gal
$12,255
-
lb
$125,050
TOTAL IMPLEMENTED $78,110 $22,451 $30,293
723,036
kWh
$2,255
-
kW-mo/yr
- $1,512
-
gal
- $44,050
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs