Assessment Year | 2001 |
---|---|
Principal Product | Corrugated Board |
NAICS |
n/a
|
SIC | 2653: Corrugated and Solid Fiber Boxes |
Sales Range | $10 M to 50M |
# of Employees | 91 |
Plant Area |
310,000
ft2
|
Annual Production | 27,367
lb
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | Michigan |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $162,325 | 4,573,271 |
kWh
|
$0.035 |
Electricity Demand | $99,959 | 10,584 |
kW-mo/yr
|
$9.44 |
Electricity Fees | $7,602 | - |
|
- |
Natural Gas | $313,709 | 63,325 |
MMBtu
|
$4.95 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $47,300 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7444: Close holes and openings in building such as broken windows | $21,500 | $4,100 | n/a | - | - |
$21,500
-
MMBtu
|
02 | 2.7243: Improve air circulation with destratification fans / other methods | $7,000 | $3,500 | n/a | - | - |
$7,000
-
MMBtu
|
03 | 2.2511: Insulate bare equipment | $7,700 | $700 | n/a | - | - |
$7,700
-
MMBtu
|
04 | 2.2437: Recover waste heat from equipment | $1,100 | $500 | n/a | - | - |
$1,100
-
MMBtu
|
05 | 2.7111: Reduce illumination to minimum necessary levels | $6,000 | $300 | n/a |
$6,000
83,212
kWh
|
- | - |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,000 | $700 | n/a |
$2,000
29,007
kWh
|
- | - |
07 | 2.3212: Optimize plant power factor | $1,500 | $2,300 | n/a | - | $1,500 | - |
08 | 2.4221: Install compressor air intakes in coolest locations | $500 | $1,000 | n/a |
$500
11,427
kWh
|
- | - |
TOTAL RECOMMENDED | $47,300 | $13,100 |
$8,500
123,646
kWh
|
$1,500 |
$37,300
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs