| Assessment Year | 2018 |
|---|---|
| Principal Product | cable trays |
| NAICS | 332313: Plate Work Manufacturing |
| SIC | 3443: Fabricated Plate Work (Boiler Shops) |
| Sales Range | $5 M to 10M |
| # of Employees | 30 |
| Plant Area |
72,000
ft2
|
| Annual Production | 531,858
pieces
|
| Production Hrs. Annual | 4,160
hrs
|
| Location (State) | Illinois |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $98,580 | 751,000 |
kWh
|
$0.13 | |
| Electricity Demand | $18,703 | 2,044 |
kW-mo/yr
|
$9.15 | |
| Natural Gas | $13,885 | 1,962 |
MMBtu
|
$7.08 | |
| Waste Disposal Costs | |||||
| Water Usage | $3,303 | 252,000 |
Tgal
|
$0.013 | |
| TOTAL YEARLY COSTS | $134,471 | ||||
| RECOMMENDED SAVINGS* | $12,626 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $12,626 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4221: Install compressor air intakes in coolest locations | $607 | $1,750 |
$505
3,855
kWh
|
$102
-
kW-mo/yr
|
- | |
| 02 | 2.7447: Install vinyl strip / high speed / air curtain doors | $10,248 | $15,240 |
$(-2,347.0)
(-17,916)
kWh
|
- |
$12,595
-
MMBtu
|
|
| 03 | 2.7135: Install occupancy sensors | $257 | $340 |
$257
1,960
kWh
|
- | - | |
| 04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $115 | - |
$115
876
kWh
|
- | - | |
| 05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,399 | - |
$1,178
8,994
kWh
|
$221
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $12,626 | $17,330 |
$(-292.0)
(-2,231)
kWh
|
$323
-
kW-mo/yr
|
$12,595
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $12,626 | $17,330 |
$(-292.0)
(-2,231)
kWh
|
$323
-
kW-mo/yr
|
$12,595
-
MMBtu
|
||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs