ITAC Assessment: MZ0249
ITAC logo
ITAC Assessment: MZ0249
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product cable trays
NAICS 332313: Plate Work Manufacturing
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $5
M
to 10
M
# of Employees 30
Plant Area 72,000
ft2
Annual Production 531,858
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $98,580 751,000
kWh
Electricity Demand $18,703 2,044
kW-mo/yr
Natural Gas $13,885 1,962
MMBtu
Waste Disposal Costs
Water Usage $3,303 252,000
Tgal
TOTAL YEARLY COSTS $134,471
RECOMMENDED SAVINGS* $12,626 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,626

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4221: Install compressor air intakes in coolest locations $607 $1,750 $505
3,855
kWh
$102
-
kW-mo/yr
-
02 2.7447: Install vinyl strip / high speed / air curtain doors $10,248 $15,240 $(-2,347.0)
(-17,916)
kWh
- $12,595
-
MMBtu
03 2.7135: Install occupancy sensors $257 $340 $257
1,960
kWh
- -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $115 - $115
876
kWh
- -
05 2.4231: Reduce the pressure of compressed air to the minimum required $1,399 - $1,178
8,994
kWh
$221
-
kW-mo/yr
-
TOTAL RECOMMENDED $12,626 $17,330 $(-292.0)
(-2,231)
kWh
$323
-
kW-mo/yr
$12,595
-
MMBtu
TOTAL IMPLEMENTED $12,626 $17,330 $(-292.0)
(-2,231)
kWh
$323
-
kW-mo/yr
$12,595
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs