Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Reconstituted Wood Products
NAICS
n/a
SIC 2493: Reconstituted Wood Products
Sales Range $50
M
to 100
M
# of Employees 193
Plant Area 400,000
ft2
Annual Production 270,000
thousand feet
Production Hrs. Annual 6,000
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,103,630 81,200,763
kWh
Electricity Demand $445,198 136,980
kW-mo/yr
Electricity Fees $597,421 -
Natural Gas $1,103,570 271,749
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $102,300 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $87,250

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.4221: Install compressor air intakes in coolest locations $8,250 $3,000 $3,291
111,340
kWh
$4,959
-
kW-mo/yr
- -
02 2.7111: Reduce illumination to minimum necessary levels $3,900 $15,000 $3,900
100,792
kWh
- - -
03 2.7447: Install vinyl strip / high speed / air curtain doors $1,550 $1,600 - - $1,550
-
MMBtu
-
04 2.7243: Improve air circulation with destratification fans / other methods $25,000 $13,700 - - $25,000
-
MMBtu
-
05 2.1221: Replace obsolete burners with more efficient ones $56,800 $75,000 - - $56,800
-
MMBtu
-
06 4.632: Change operating conditions $6,800 $11,000 - - - $6,800
TOTAL RECOMMENDED $102,300 $119,300 $7,191
212,132
kWh
$4,959
-
kW-mo/yr
$83,350
-
MMBtu
$6,800
TOTAL IMPLEMENTED $87,250 $105,300 $3,900
100,792
kWh
- $83,350
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings