ITAC Assessment: SF0199
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Truck Frames
NAICS
n/a
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 225
Plant Area 109,000
ft2
Annual Production 150,000
pieces
Production Hrs. Annual 6,120
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $434,544 8,038,867
kWh
Natural Gas $155,023 51,332
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $29,020 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $24,413

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 4.111: Add equipment/ operators to reduce production bottleneck $584 - $584
10,843
kWh
02 2.2611: Moderate cooling tower outlet temperature $4,250 $850 $4,250
73,406
kWh
03 2.4311: Recover mechanical energy $2,307 $345 $2,307
42,833
kWh
04 2.4311: Recover mechanical energy $2,300 $345 $2,300
42,711
kWh
05 2.7135: Install occupancy sensors $1,079 $1,080 $1,079
20,031
kWh
06 2.7135: Install occupancy sensors $1,583 $2,000 $1,583
29,391
kWh
07 2.4133: Use most efficient type of electric motors $12,739 $36,345 $12,739
77,577
kWh
08 2.7142: Utilize higher efficiency lamps and/or ballasts $4,178 $13,460 $4,178
77,577
kWh
TOTAL RECOMMENDED $29,020 $54,425 $29,020
374,369
kWh
TOTAL IMPLEMENTED $24,413 $53,735 $24,413
288,825
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs